Published June 18, 2020 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Hoffman Est, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The work includes, but is not limited to, construction of paved trail drainage improvements, including earthwork, asphalt patching, storm sewers, soil erosion / sediment control and landscaping, construction layout, traffic control and protection, and other related work as specified in the plans & specifications. During the bid process, all inquiries must be directed in writing and/or emailed to the District's Purchasing Agent as follows: Purchasing Agent Forest Preserve District of Cook County 69 W Washington Street, Suite 2060 Chicago, IL 60602 Fax: (312) 603-9961 Email: fpd.purchasing@cookcountyil.gov All questions must be received in writing by 5:00 p.m. JUNE 4, 2020. The District seeks the following participation goals with respect to Minority-owned Business Enterprises ("MBE") and Women-owned Business Enterprises ("WBE") for this project: 24 % MBE participation goal and a 10 % WBE participation goal This determination is based upon the scope of work, estimated project cost and the availability of certified MBEs and WBEs that are certified to provide the type of work needed to successfully complete this project. Collectively, MBEs and WBEs shall be deemed "MBE/WBEs". Bidders requiring assistance in meeting these goals are encouraged to contact: Contract Compliance Administrator Forest Preserve District of Cook County (312) 603-8342 Email: sergio.silva@cookcountyil.gov Submission of a Certificate of Intent to Comply with the Cook County Resident Employment is required for all construction projects over $100,000. Work shall be substantially completed within 63 calendar days from the date that the District issues the Notice To Proceed. Substantial completion is the stage in the progress of the Work, as defined in the General Conditions, or a designated portion thereof, that is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. Liquated damages clause in Section GC-4(g) is applicable to the Work. The Contract shall end within 91 calendar days from the Substantial Completion date. The Contract end date is the date on which all Work shall be completed in accordance with the Contract Documents for the referenced project. (Work includes, but is not limited to, request for Final Payment and excludes any warranty related work.) WBK PROJECT NUMBER 180319 20-00-005493 20-80-005520 20-80-005514 20-80-005550 20-80-005490 20-80-005521

Post-Bid

Roads / Highways

$400,000.00

Public - County

Paving, Site Work

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
144
Bidding Soon
2,846
All Active Projects
1,169
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2020

July 20, 2020

img_map_placeholder

Multiple Locations, Hoffman Est, IL


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Paul Douglas Forest Preserve Paved Trail Drainage Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.