BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2020 at 8:00 PM

Updated September 15, 2023

Site work and paving for a road / highway in Milano, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of July 23, 2020, a general contractor has been selected. All trades have been let. For PS&e Project Questions Call: Chad Bohne 2591 North Earl Rudder Fr Bryan, Tx 77803 979/778-9710 For Questions Regarding a Proposal Call 512/416-2498 Length: 2.6760Mi Time for Completion: 270 Working Days ------------------------------------------------------------------------------ County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Milam0204-06-060fm 487 (Ackerman Street) Us 79stp 2019(460)tapsburleson Street Length: 0.1310 Miles Milam0204-06-0590.2 Miles E of Us 77 Us 79nh 2020(952)0.5 Miles West of Fm 487 Length: 2.5450 Miles TX DOT - US 79 - Sidewalk, Ramps, Benches and Lighting

Award

Roads / Highways

$4,509,032.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
394
Active Projects
182
Bidding Soon
3,616
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.