BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Alton, Illinois. Completed plans call for the renovation of a medical facility.

Minority, Female & Veteran Business Subcontractor/Supplier Participation is Applicable Bidders must be prequalified with CDB; allow 45 days for application processing. This project involves replacement of roofing systems and accessories and related work including masonry repairs, sheet metal and painting, at the Alton Mental Health Center located in Madison County, Illinois and essentially includes the following work: a. Administration Building – BD072: Work to include remove/replace the existing shingle roof system on the three-story building. Abate the lead paint from the soffits and fascia and repaint. Repoint the existing masonry joints on the tower. Remove the existing EPDM roof system on the two-story section and install TPO membrane roof system. b. Locust Building – BD013: Work to include removing the existing shingle system on the steep slope sections of the building, over-frame the and install asphalt shingle roofing system. Remove the existing modified bitumen roof system on the single-story section and install TPO membrane roof system. c. Holly Building – BD005: Work to include remove/replace the existing shingle roof system on the steep slope sections of the building, including overframe of the existing roof. Remove the existing EPDM on the low slope roof sections to the existing wood deck install TPO membrane roof system. Remove/replace the mansard roofs including framing. d. Recreation Hall – BD012: Work to include remove/replace the existing modified bitumen roof system on the gymnasium section and remove the existing EPDM roof system on the two-story section and install TPO membrane roof system. e. Security Building – BD065: Work to include removing the existing ballasted EPDM roof system and install TPO membrane roof system. f. Garage Building – BD022: Work to include remove the existing EPDM roof system and install TPO membrane roof system. g. Hickory Building – BD018: Work to include remove/replace the existing shingle roof system on the steep slope sections of the building, including overframe the existing roof.

Post-Bid

Medical

Public - State/Provincial

Renovation

25

19

6

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
29
Bidding Soon
853
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2020

August 24, 2020

img_map_placeholder

4500 College Ave, Alton, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.