BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2025 at 8:00 PM

Updated September 19, 2025

Site work and new construction of a water / sewer project in Apex, North Carolina. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

This project includes construction of Big Branch Pump Station (capacity of 3 million gallons per day) and approximately 6 miles of 30 inch force main that will discharge at the Western Wake Regional WRF. This infrastructure is needed to serve the Big Branch Basin, which is generally located in the triangle between I-540, US 1, and NC 55. As of September 18, 2025, this project is in permitting. An architect has been selected. A firm timeline for bidding and construction has not been announced.

Final Planning

Water / Sewer

$36,800,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
141
Bidding Soon
1,662
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.