BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2020 at 8:00 PM

Updated September 15, 2023

Site work, paving and outdoor lighting for a civil project in Eglin, Florida. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; and road / highway.

There is no architect chosen since it is civil project. Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 03 Selection Method : Letter of Response and Interview Project Description : Multi-Group Design TRC Members (Subject to Change) : Alaina Webb John Whittington Ryan Adams Under-Utilization Goal for DBEs and Small Businesses - The goal of the Departments Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. Design Group 21-04: SR 30 (US 98) from West of Josie Road to West of Brooks Bridge and SR 285 from SR 20 John Sims Parkway to South of SR 293 Midbay Connector. Project Manager - Clay Hunter. Contract Manager - Teresa Howell. Estimated Contract Amount - $1,976,000.00 Design Group 21-05: SR 89 from North of SR 87 to South of County Road 178 and SR 10A (US 90) Scenic Highway from North of SR 8 (I-10) to SR 10 (US 90A). Project Manager - Lauren Bamford. Contract Manager - Teresa Howell. Estimated Contract Amount - $2,041,000.00 Design Group 21-06: SR 71 from SR 10 (US 90) to North of Basswood Road and SR 63 (US 27) Monroe street from John Knox Road to Lake Shore Drive. Project Manager - Ryan Adams. Contract Manager - Ashley Taylor. Estimated Contract Amount - $1,890,000.00 Shortlist Selection Date/Time - 7/20/2020 07:30 pm Final Selection Date/Time - 8/31/2020 07:30 pm Negotiations Period Begin Date - 9/01/2020 Negotiations Period Ending Date - 10/27/2020 The method of contractor selection has not been determined at this time. FDCOT - RFP Engineering - Multi-Group Design

Design

Bridges / Tunnels

$5,907,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
53
Bidding Soon
791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2021

Project location map

Multiple Locations, Eglin, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.