Published September 18, 2020 at 8:00 PM

Updated September 15, 2023

Site work, paving and outdoor lighting for a civil project in Eglin, Florida. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; and road / highway.

There is no architect chosen since it is civil project. Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 03 Selection Method : Letter of Response and Interview Project Description : Multi-Group Design TRC Members (Subject to Change) : Alaina Webb John Whittington Ryan Adams Under-Utilization Goal for DBEs and Small Businesses - The goal of the Departments Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. Design Group 21-04: SR 30 (US 98) from West of Josie Road to West of Brooks Bridge and SR 285 from SR 20 John Sims Parkway to South of SR 293 Midbay Connector. Project Manager - Clay Hunter. Contract Manager - Teresa Howell. Estimated Contract Amount - $1,976,000.00 Design Group 21-05: SR 89 from North of SR 87 to South of County Road 178 and SR 10A (US 90) Scenic Highway from North of SR 8 (I-10) to SR 10 (US 90A). Project Manager - Lauren Bamford. Contract Manager - Teresa Howell. Estimated Contract Amount - $2,041,000.00 Design Group 21-06: SR 71 from SR 10 (US 90) to North of Basswood Road and SR 63 (US 27) Monroe street from John Knox Road to Lake Shore Drive. Project Manager - Ryan Adams. Contract Manager - Ashley Taylor. Estimated Contract Amount - $1,890,000.00 Shortlist Selection Date/Time - 7/20/2020 07:30 pm Final Selection Date/Time - 8/31/2020 07:30 pm Negotiations Period Begin Date - 9/01/2020 Negotiations Period Ending Date - 10/27/2020 The method of contractor selection has not been determined at this time. FDCOT - RFP Engineering - Multi-Group Design

Design

Bridges / Tunnels

$5,907,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Assurance, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Postal Specialties
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Paving Specialties, Pavement Markings, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
27
Bidding Soon
465
All Active Projects
194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2021

img_map_placeholder

Multiple Locations, Eglin, FL

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

RFP Engineering - Multi-Group Design

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.