BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 10, 2020 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in West Bridgewater, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The signalization of West Center Street and Howard Street consists of the installation of a fully-actuated traffic control signal system, including: mast arms, poles, foundations and pedestrian signals; full-depth roadway construction; pavement milling and overlay; curbing, sidewalks and wheelchair ramps; pavement markings and signing; and temporary traffic control. Contractor Qualification - Highway Division

Award

Roads / Highways

$587,510.00

Public - City

Paving, Site Work

21

9

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
188
Bidding Soon
3,317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2020

July 27, 2020

Project location map

Howard St & W Center St, West Bridgewater, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.