Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 8, 2020 at 8:00 PM
Updated April 15, 2024
Site work for a water / sewer project in Hillside, Illinois. Completed plans call for site work for a water / sewer project.
The work under this contract is to be performed on: Tri-State Tollway (I-294) between Mile Post 35.0 and Mile Post 35.2 in Cook County, Illinois (Cook). The scope of the work shall consist of construction of a sanitary sewer, abandoning and filling an existing sanitary sewer, excavation and grading compensatory storage area for Addison Creek, erosion control measures, landscape improvements and protection of existing utilities on the Murnane property. Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4656D.4537. Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on June 12, 2020.
Bid Results
Water / Sewer
$1,644,364.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
