Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a civil project in Homestead, Florida. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
The construction and services required by the Contract Documents, which includes all labor, materials, equipment, and services to be provided by the Contractor to fulfill the Contractor's obligations.The construction and services required by the Contract Documents, which includes all labor, materials, equipment, and services to be provided by the Contractor to fulfill the Contractors duties and obligations imposed by the Contract Documents.The Contractor shall construct all joints in concrete at the locations shown on the Plans. Joints required in concrete structures are of various types and will be permitted only where shown on the Plans, unless specifically accepted by the Engineer. The Contract will be awarded based on the Total Base Bid Amount. The City reserves the right to award or reject any or all bids. An item of work not provided for in the awarded contract as previously modified by Change Order, but which is found by the Architect/Engineer to be necessary to complete the work within the intended scope of the Contract. Liquidated Damages: The amount that the Contractor accepts, as stipulated herein, that will be deducted from the Contract Sum for each Calendar day of delay due to a Non-excusable Delay. Liquidated indirect Costs: The amount stipulated in the Bid Form that will be added to the Contract sum for each Calendar Day of delay due to a Compensable Delay. The Contractor accepts this sum as full compensation for the Contractors and all its Subcontractors Indirect Costs, for each day of Excusable Compensable Delays. Bonds executed by the Contractor and his Surety, on the attached forms, assuring that the Contractor will, in good faith, perform and guarantee the work in full conformity with the terms of the Contract Documents and will promptly pay all persons supplying the Contractor with labor, materials, or supplies, used directly or indirectly by the Contractor in the prosecution of the Work. The estimated budget for this project is $750,000.00.
Bid Results
Water / Sewer
$899,900.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2022
June 2, 2022
1991 SE 38th Ave, Homestead, FL
Related To This Project
Homestead, FL
--
Homestead, FL
Bid Date: Feb 09 2023
Homestead, FL
--
Homestead, FL
--
Homestead, FL
Bid Date: Oct 05 2023
Homestead, FL
--
Homestead, FL
--
Homestead, FL
Bid Date: Mar 23 2022
Homestead, FL
--
Homestead, FL
Bid Date: Sep 08 2021
Homestead, FL
Bid Date: Mar 01 2022
Homestead, FL
--
Homestead, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.