BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Homestead, Florida. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The construction and services required by the Contract Documents, which includes all labor, materials, equipment, and services to be provided by the Contractor to fulfill the Contractor's obligations.The construction and services required by the Contract Documents, which includes all labor, materials, equipment, and services to be provided by the Contractor to fulfill the Contractors duties and obligations imposed by the Contract Documents.The Contractor shall construct all joints in concrete at the locations shown on the Plans. Joints required in concrete structures are of various types and will be permitted only where shown on the Plans, unless specifically accepted by the Engineer. The Contract will be awarded based on the Total Base Bid Amount. The City reserves the right to award or reject any or all bids. An item of work not provided for in the awarded contract as previously modified by Change Order, but which is found by the Architect/Engineer to be necessary to complete the work within the intended scope of the Contract. Liquidated Damages: The amount that the Contractor accepts, as stipulated herein, that will be deducted from the Contract Sum for each Calendar day of delay due to a Non-excusable Delay. Liquidated indirect Costs: The amount stipulated in the Bid Form that will be added to the Contract sum for each Calendar Day of delay due to a Compensable Delay. The Contractor accepts this sum as full compensation for the Contractors and all its Subcontractors Indirect Costs, for each day of Excusable Compensable Delays. Bonds executed by the Contractor and his Surety, on the attached forms, assuring that the Contractor will, in good faith, perform and guarantee the work in full conformity with the terms of the Contract Documents and will promptly pay all persons supplying the Contractor with labor, materials, or supplies, used directly or indirectly by the Contractor in the prosecution of the Work. The estimated budget for this project is $750,000.00.

Bid Results

Water / Sewer

$899,900.00

Public - City

New Construction, Site Work

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
30
Bidding Soon
869
All Active Projects
359
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2022

June 2, 2022

img_map_placeholder

1991 SE 38th Ave, Homestead, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.