BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Eugene, Oregon. Completed plans call for site work for a road / highway.

2 EA Remove Tree 4" and 6"; 39 CY General Excavation; 30 FT 10 Inch PVC Pipe C900; 250 FT 12 Inch PVC Pipe C900; 378 FT 15 Inch PVC Pipe C900; 655 FT 18 Inch PVC Pipe C900; 188 FT 30 Inch PVC Pipe; 6 EA Concrete Manholes, Storm; 1 EA Water Quality MH; 2 EA Planter Over Flow Inlets; 1 EA Remove Sediment Baffle and Hardware; 4 EA Abandon Manhole In Place; 142 FT Filling Abandoned Pipes; 1 LS Clean Existing Storm System; 2 EA Modify Existing Curb Inlet; 350 TN Level 2, 1/2 Inch ACP Mixture - Trench Patch; 10 FT Concrete Curbs, Curb and Gutter; 71 FT Concrete Curbs, Planter Curb; 71 FT Concrete Curbs, Planter Curb - Notched; 67 SF Concrete Walks, 4" Thick; 1 LS Thermoplastic, Extruded, Surface, Non-Profiled; 905 SF Lawn Seeding; 18 CY Storm Facility Blended Soil; 485 FT Tree Protection Fencing; 1 LS Remove, Salvage and Reinstall Fence The scope of work for this contract includes: - Decommissioning existing drywells - Constructing new storm drain pipes and manholes - Construction of new water quality Facilities and Manholes - Trench Restoration - Temporary Traffic Control Engineer's Estimate: $350,000 - $450,000 Bids shall be accompanied by a certified check, cashier's check or bidder's bond payable to the City of Eugene in an amount equal to ten percent of the amount bid. Filing of a qualification questionnaire before bidding will not be required. Contingent or conditional bids will not be considered for acceptance. This public works improvement project is subject to payment of prevailing rate of wages, per BOLI ORS 279C.800 to 279C.870. No bid will be received or considered unless the bid contains a statement by the bidder that provisions of ORS 279C.800 to 279C.870 pertaining to prevailing wage rates shall be complied with. Bidders are required to submit a First-Tier Subcontractor Disclosure form, substantially as described in ORS 279C.370, within two working hours of the bid closing date and time. For this project the first-tier subcontractor disclosure statement must be submitted regardless of the bid amount. No bid will be accepted by the City unless it contains a statement by the bidder as a part of the bid that the bidder in carrying out the contract will comply with all applicable laws. The City may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids or to waive any specification or requirement upon a finding of the City that it is in the public interest to do so.

Award

Water / Sewer

$393,845.00

Public - City

Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
15
Bidding Soon
183
All Active Projects
92
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2020

July 27, 2020

img_map_placeholder

Multiple Locations, Eugene, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.