BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work for a water / sewer project in Bonsall, California. Design plans call for site work for a water / sewer project.

Update: Replace the existing two 21" X 47" corrugated steel pipes with a system capable of handling a 100-year storm event to improve safety. Project is included San Diego County Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:https://www.sandiegocounty.gov/content/dam/sdc/dpw/ENGINEERING_SERVICES/5-Year/CIP%20Capital%20Improvement%20Plan%202024-25%20to%202028-29.pdf Replace the existing two 21" X 47" corrugated steel pipes with a system capable of handling a 100-year storm event to improve safety. Project is included San Diego County Fiscal Year 2025-2029 Page no 34 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE: https://www.sandiegocounty.gov/content/dam/sdc/dpw/CIP%20Capital%20Improvement%20Plan%202023-24%20to%202027-28.pdf Replace the existing two 21" X 47" corrugated steel pipes with a system capable of handling a 100-year storm event to improve safety. Project is in San Diego County capital budget fy 2023-2028 CIP 101 __________________________________________________________________________________________________________________________________________ This project will replace the existing two (21" X 47" CSPA) with a system capable of handling a 100-year storm event. This project was requested to improve safety by the Flood Control Program. The project is included in the San Diego County's FY 2021-2025 Capital Improvement Program (CIP). Per the owner, as of October 13, 2022, this project is in design and the owner states that they still need to acquire right of way and clear environmental. Owner states that they do not plan to go out for construction until 2024. Design team information has not been disclosed by the owner. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$7,500,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
571
Active Projects
268
Bidding Soon
3,850
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

Camino Del Rey, Bonsall, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.