BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a pre-engineered storage facility in Bryan, Texas. Completed plans call for the addition of a 1,100-square-foot pre-engineered storage facility; for the demolition of a pre-engineered storage facility; for the renovation of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Transformer Containment Building for Bryan Texas Utilities, construction of 1200 sf new addition to the existing warehouse located at 611 Union Street, Bryan, Texas 77801. PEMB: The new addition will be a pre-engineered metal building is to match the configuration of the existing metal building. The building will be insulated and contain one walk door and one manually operated overhead door. Electrical and Mechanical/ HVAC: The building will require electrical sub feed from existing warehouse electrical panels. The building will contain power and exterior and interior lighting only. No ventilation or HVAC will be required in the new building. Pathway conduits will be provided for Owner supplied and installed security cameras. The building will not require plumbing and will not require fire sprinkler system. Foundation: The buildings foundation will be constructed so as to provide a containment wall at the perimeter wall as shown on the drawings. The finish grades and the containment wall will require a forklift ramp up to the top of the containment wall and down into the bottom of the containment finish floor as shown on the drawings. The slab on grade foundation will be supported by drilled foundation piers. Location - The Project is located at 611 Union Street, Bryan, Texas 77801 (to be re-addressed by the City of Bryan as 2301 Fountain Avenue, Bldg 211, Bryan, Texas 77801). BTU has established a target commencement date for construction activities as August 12, 2020. The projected completion date is estimated to be 90 days. BTU reserves the nght to modify the commencement date, subject to Owner and Contractor availability, phase the construction of the Project, or modify the schedule as needed and determined by BTU due to modifications in scope. Project Budget - The proposed budget for construction costs for this Project is $204,281.00, inclusive of all incidental and contingent expenses associated with the construction of the entire scope of the Project. Earliest Award August 10, 2020 Construction or Service Commencement August 17, 2020 Pre-Construction or Service Meeting TBD Completion November 16, 2020 Each Proposal must be accompanied by a certified check, cashier's check, or an approved Bid Bond/Proposal Guaranty in the amount of 5% of the Proposal cost, payable to Bryan Texas Utilities without recourse, as a guarantee the Proposer will enter into a contract and execute 100% performance and payment bonds on the forms provided, within ten (10) days after the contract has been awarded. A Performance Bond in the amount of one hundred percent (100%) of the contract price will be required (if the contract exceeds $100,000). A Payment Bond in the amount of one hundred percent (100%) of the contract price will be required (if the contract amount exceeds $50,000). All Responses must be in BTU's possession on or before the scheduled date and time (no late responses will be considered). BTU's Purchasing Department is not open for weekend or holiday deliveries. The Procurement Specialist can be reached at 979-209-5501. BTU reserves the right to reject any or all Responses, to waive any or all formalities or technicalities, and to make such awards of contract to the lowest responsible proposer. All requests for additional information or clarification concerning this response must be submitted in writing using the eProcurement site on or before 2:00 pm CDST, July 16, 2020. Questions received after the stated deadline will not be answered. Questions submitted and BTU's responses will be posted with this solicitation as addenda.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$170,000.00

Public - City

Addition, Demolition, Renovation, Site Work

23

21

7

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
1,435
All Active Projects
535
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.