BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a road / highway in Parker, South Dakota. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

As of August 11 , 2020 project was awarded to Wayne Meyer Electric Inc , xfer call to Adame and said that awarded amount of $130,157.60. The project will start tomorrow and end date is to be determined. The general nature of the work on which proposals will be received consists of the following: Replacement of the city's street lighting along Main Avenue south of Railroad Street (approximately two (2) blocks) to the County Courthouse with new decorative lighting. Involved is the furnishing and installing of street lights, poles, foundations and concrete work, underground electric cable and conduit, boring, and other excavations. All of the above work and equipment shall be in accordance with the plans and specifications and proposed form of contract now on file in the office of the City in said City of Parker, South Dakota, by this reference made a part hereof, as though fully set out and incorporated herein. Bids shall be made out on a bid form furnished by the Engineer and shall be accompanied by a certified check, cashier's check, or bank draft payable to the City of Parker in the amount of five percent (5%) of the total bid, said check to be drawn on a state or national bank or by bid bond in an amount of ten percent (10%) of the total bid, issued by a surety authorized to do business in the State of South Dakota, said bond to be made payable to the City of Parker. The bid security must not contain any conditions either in the body or as an endorsement thereon. Such bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within ten (10) days after the award of contract. Payment to the Contractor for said improvements will be made from cash on hand or such other funds that legally may be used or obtained for such purposes. Estimates will be paid monthly by the City to the Contractor in accordance with the following schedule: Ninety percent (90%) upon certification of units completed; ten percent (10%) not less than thirty (30) days after final completion and acceptance. The construction shall be performed upon a Notice to Proceed issuance. Substantial completion of the project shall be no later than September 30, 2020. See the "Construction Schedule" section of the General Items portion of the Technical Specifications for special instructions relating to staging of construction for this project. The Council reserves the right to defer acceptance of any proposal for a period not to exceed 30 days after the date proposals are received and no proposal may be withdrawn during this period. The Council reserves the right to reject+any or all bids and enter into such contract as it shall deem to be in the best interest of the City.

Award

Roads / Highways

$130,158.00

Public - City

Outdoor Lighting, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
15
Bidding Soon
228
All Active Projects
113
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2020

August 7, 2020

img_map_placeholder

Multiple Locations, Parker, SD

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.