Site work and new construction of a water / sewer project in Huron, South Dakota. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The Project shall consist of the following work and approximate quantities and kinds of materials: Construction of a new wastewater treatment facility. The project includes precast concrete, cast-in-place concrete, masonry, electrical, plumbing, HVAC, sequencing batch reactor (SBR), mechanical screening, grit removal, conveyor, site piping, site work and miscellaneous appurtenant work. Bidders on this work will be required to comply with the President's Executive Order Nos. 11246 (Equal Employment) as amended, 11518 (Small Business Concerns), and 11625 (MBE) as amended. The requirements for bidders and contractors under these orders are explained in the specifications. The Contract Documents may be examined at the following locations: City of Huron, SD, PO Box 1369, 239 Wisconsin Avenue SW Huron, SD 57350; DGR Engineering, 1302 South Union Street Rock Rapids, IA 51246 Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138. The requirements for bidders and contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Women's Business Enterprises (WBE) are explained in the specifications. The DBE/MBE and WBE goals for participation in this contract in terms of percentage of contract value are as follows: MBE 1.0 percent; WBE 4.0 percent. The low responsive bidder will be required to certify to compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014. This certification form may be found on page AIS-21 of the State Revolving Fund (SRF) General Conditions and must be included in the bid proposal. Please be advised that waivers or exemptions from the American Iron and Steel provision that cite International Trade Agreements DO NOT comply with the Consolidated Appropriations Act of 2014 as it applies to the SRF programs. Claims from suppliers that the American Iron and Steel provision does not apply to certain products based on the International Trade Agreement exemptions of the Consolidated Appropriations Act of 2014 will not be accepted. A current directory of DBE firms can be found at the SD DOT Compliance Office (605)773-4906 Your special attention is invited to the attached DBE Subcontractor Solicitation Information form, DBE Subcontractor Performance Form, DBE Subcontractor Utilization Form, Certification Regarding Debarment, Suspension and Other Responsibility Matters (Debar) form, American Iron and Steel Certification. These forms must be completed and submitted with your bid proposal. Failure to submit these forms will be cause for the bid to be rejected. Please be advised that good-faith efforts will be subjected to close scrutiny and if the good-faith effort submission is unacceptable, your bid will be rejected. The low responsive bidder must assure compliance with the requirements of Public Law 115-232, Section 889, Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. Contractors must assure that telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities), and video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities) WILL NOT be supplied for the project. Each bid must be accompanied by bid security payable to the Owner for five (5%) percent of the total amount of the Bid as a certified or bank check issued by a State or National bank or ten percent (10%) as a bidder's bond. The Owner reserves the right to reject any and all bids or to accept any bid. Bidder's Proposal shall hold firm for thirty (30) days from the date of opening. Mutually agreed upon extensions of time may be made, if necessary. MBE 1.0 percent; WBE 4.0

Award

Water / Sewer

$12,769,500.00

Public - City

New Construction, Site Work

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
9
Bidding Soon
103
All Active Projects
45
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2021

February 18, 2021

img_map_placeholder

To Be Determined, Huron, SD

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.