BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a water / sewer project in Nome, Alaska. Conceptual plans call for site work for a water / sewer project.

The plan calls for nearly doubling the length of the port's west causeway to reach close to 2,100 feet farther into Norton Sound with a nearly 1,400-foot breakwater to protect harbor entrance from incoming waves. The L-shaped barrier would also hold two new 450-foot and one new 600-foot dock to handle the larger vessels. The existing east causeway-breakwater would be demolished and replaced with a larger, 3,900-foot causeway-breakwater that would greatly expand the port's outer basin. Approximately three-quarters of the material from the existing east causeway would be used to build its replacement. The $618 million price tag breaks down: $386 million funded by the federal government $123 million would come from the City of Nome for the navigation features $128 million for infrastructure deemed "local facilities" such as access roads, docks, utilities and other items As of October 13, 2022, this project is conceptual. The Port of Nome Modification Feasibility Study is the latest iteration in a series of proposals made over the past decade to upgrade maritime facilities along Alaska's largely undeveloped western coast. Local government leaders are working with consultants on a plan to fund the project from several possible sources, but they are not yet ready to disclose the details. The US Army Corps Alaska District approved the project. The US Congress need to appropriate funding for the federal portion of the project in a spending bill. Bidding for designers and contractors has not been established. A firm construction timeline is not available. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Water / Sewer

$618,000,000.00

Public - Federal

Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
1
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2025

img_map_placeholder

307 Belmont St, Nome, AK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.