Site work and new construction of a pre-engineered storage facility in Decatur, Illinois. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of January 4, 2022, the project has not yet been awarded. A timeline for award not yet been established. Questions, Clarifications, additional manufacturers, etc. must go to by November 29, 2021, to be posted by December 3, 2021 Decatur scope includes the demolition of existing building and construction of a new equipment storage building. Leverett scope includes demolition of existing building and construction of a new materials building and a new equipment building. The State of Illinois, acting by and through the Capital Development Board, as Obligee, in the amount of ten percent (10%) of the amount of the base bid for the payment of which Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, to this agreement. 1. Decatur: Demolition of Existing Cold Storage Building D0540 (Alternate G-2). Construction of New Equipment Storage Building, IDOT 340-0005, with electrical, heating (Alternate G-1), plumbing, and ventilation systems. Electrical work to include new electric service secondary feeder, panel board, lighting, door openers, etc. Leverett: Demolition of Existing Cold Storage Building D0522, Construction of New Equipment Storage Building, IDOT 352-0002, with electrical and ventilation systems, and construction of New Material Storage Building, IDOT 352-0003, with electrical systems. Electrical work to include new electric service secondary feeder, panelboards, lighting, door openers, etc. Within ten (10) calendar days from the date of the notice of award letter, the Contractor shall furnish, on CDB forms, the following: A. Contract executed by the Contractor; B. Performance Bond; C. Labor and Material Payment Bond; D. Certificates of Insurance; E. Builder's Risk Insurance Policy (if applicable); F. MBE/WBE/PBE/VBE Subcontractor Supplier Certifications, Form 00665 and MBE/WBE/PBE/VBE Subcontractor/Supplier agreements (if applicable); G. Completed Substance Abuse Prevention Certification form and Contractor's substance abuse plan (if applicable); H. DHR PC-2 accepted by FEP Technician; I. Project Labor Agreement signature sheets for the Contractor and known Subcontractors (if applicable); and J. Illinois Works Jobs Program Act Apprenticeship Initiative Budget Supplement GENERAL under $1,500,000 All post award requirements are mandatory. Noncompliance shall be cause for CDB to cancel the notice of award and make a claim against the bid security. 4% MBE, 2% WBE, 0% VBE/PBE

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,711,000.00

Public - County

New Construction, Site Work

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
54
Bidding Soon
910
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2021

February 7, 2022

Project location map

Multiple Locations, Decatur, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.