Published August 14, 2020 at 8:00 PM

Updated February 18, 2025

Site work for a water / sewer project in Downey, California. Completed plans call for site work for a water / sewer project.

** The project is anticipated to start mid-August and will be 90 working days. The work to be performed under this Contract generally consists of the construction of water system improvements on 3rd Street between Old River School Road and Rives Avenue, as shown on the contract plans. The work to be performed generally consists of potable water main improvements including the installation of new main, fire hydrant assemblies, water service lines, meters and boxes; installation of gate valves, crosses, tees, bends, thrust blocks, and fittings; abandoning of existing water mains, service lines, and other associated facilities; removal and salvaging of existing fire hydrant assemblies, existing water meters, and boxes; clearing and grubbing; trenching, backfilling and compacting; asphalt concrete (AC) and Portland cement concrete (PCC) pavement reconstruction; reconstruction of miscellaneous PCC improvements, landscaping, irrigation, and other existing improvements disturbed during the course of construction; traffic control; and all labor, tools, materials, equipment, and appurtenant work thereto necessary for the proper construction of the contemplated improvements, in accordance with Plans and Specifications entitled Capital Improvement Project No. 20-23.

Award

Water / Sewer

$1,067,860.00

Public - City

Site Work

12

6

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
685
Active Projects
274
Bidding Soon
3,389
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2020

August 24, 2020

Project location map

3rd St, Downey, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.