Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 28, 2020 at 8:00 PM
Updated August 29, 2025
Site work and new construction of a civil project in Miami, Florida. Completed plans call for site work for a bridge / tunnel; for the construction of a water / sewer project; and water / sewer project.
*Contract Award Date: Sep 25, 2020 Contract Award Number: W912EP20C0020 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 009821422 Contractor Awarded Unique Entity ID (SAM): Contractor Awarded Name: HARRY PEPPER & ASSOCIATES, INC. Contractor Awarded Address: Jacksonville, FL USA Base and All Options Value (Total Contract Value): $8170821.93 The BBCW Contract 5A covers the construction of Pump Station S-705. The S-705 pump station has a capacity of 100 cfs and is located on the L-31E Canal at the intersection with the C-102. S-705 will pump water into an L-31E Canal segment, south of C-102 and north of Military Canal. The water in this segment will flow, through culverts, into wetlands east of the L-31E Levee. S-705 will also feature a 72-inch culvert with a slide gate to pass flows for internal drainage. The pump station will have manatee protective barriers, trash racks, and dewatering features, complete with stop logs. The slide gate at S-705 will be operated by an electric-motor actuator. Controls will be located in a stand-alone, precast concrete building adjacent to the pump station structure. The pumps and gate will have remote operation capability. Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, concrete piles, precast concrete, cast-in-place concrete, tremie concrete, flowable fill, an HDPE culvert, a slide gate, precast, concrete, control buildings, pumps, pump platform, pump station controls, electrical work, lighting, lightning protection, fencing, excavation, backfilling, stockpiling, clearing and grubbing, grading, placement of topsoil, sodding, limerock road topping, riprap and bedding stone, installation of stilling wells, stilling well platforms, staff gauges and floating barriers. Additional construction activities may include dewatering, and installation of cofferdams. In-water construction utilizing divers will be necessary, because of dewatering difficulty due to the local geology and high conductivity of the underlying limestone. Soil borings indicate the presence of hard limestone within the project area. Excavation of limestone may require large excavator with rock bucket. Materials for embankment and backfill construction can be obtained from offsite sources provided by the Contractor and approved by the Contracting Officer or the Contractor can process the excavated material to meet the classification of satisfactory material for embankment fill and or select fill at no additional cost to the Government. Contract does not allow blasting within the construction limits. Magnitude of Construction is Between $5,000,000.00 and $10,000,000.00. This is an Unrestricted Solicitation All Responsible Offerors Are Encouraged to Participate. The Naics Code for This Project is 237990 and the Small Business Size Standard is $39.5 Million
Award
Water / Sewer
$8,170,821.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2020
November 13, 2020
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
Bid Date: Oct 01 2025
Miami, FL
Bid Date: Oct 13 2025
Miami, FL
Bid Date: Nov 03 2025
Miami, FL
Bid Date: Oct 28 2025
Miami, FL
Bid Date: Oct 15 2025
Miami, FL
Bid Date: Oct 03 2025
Miami, FL
Bid Date: Dec 19 2025
Miami, FL
Bid Date: Oct 02 2025
Miami, FL
Bid Date: Aug 28 2025
Miami, FL
Bid Date: Aug 28 2025
Miami, FL
Bid Date: Aug 28 2025
Miami, FL
--
Miami, FL
Bid Date: Sep 24 2025
Miami, FL
Bid Date: Sep 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
