Published July 24, 2020 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Egg Harbor Township, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.

For 2020 Road Program Work consists of reconstructing roadways including Dogwood Avenue and Asbury Avenue. The work shall be completed within sixty (60) calendar days of the Contractor's receipt of written Notice to Proceed. No bid will be received unless in writing on the forms furnished, and unless accompanied by bid security in the form of a bid bond or certified check made payable to the Owner in an amount equal to 10% of the amount of the total bid, provided that the said security need not be more than $20,000 nor less than $500.00 and be delivered at the place on or before the hour named above. The bid shall be accompanied by a Certificate of Surety on the form included in the Contract Documents, from a surety company licensed to do business in the State of New Jersey, which shall represent that the surety company will provide the Contractor with the required bonds in the sums required in the Contract Documents and in a form satisfactory to the Owner's Attorney and in compliance with the requirements of law. Each bidder shall submit with his bid an "Ownership Disclosure Statement" and "Non-Collusion Affidavit" as stated in Public Law, 1975, C.127 NJSA 34:11-56,25 et seq. as amended in chapter 64 of the Laws of 1974 and P.L. 1977 Ch.33, NJSA 52:25-24.2 on the forms included in the Contract Documents. Public Works Contractor Registration pursuant to NJSA 34:11-56.48 et. Seq. is required for all projects/contracts that include construction, reconstruction, demolition, alter at ion, and alteration of repair or maintenance work on a public building. All Contractors and Subcontractors are required to submit a copy of their Business Registration Certificate issued by the NJ Division of Taxation (PL 2004, c 57 effective 9-1-04). Compliance with the New Jersey Prevailing Wage Act (N.J.S.A. 34:11-56.25) is required. Bidders must use the prepared proposal forms that are contained in the Contract Documents. Each individual proposal must be separately enclosed in a sealed envelope addressed to the Owner and marked on the outside with the number of the contract(s) and name of the project being bid on. After receipt of bids, no bid shall be withdrawn except as expressly authorized herein. The Owner shall award the Contract or reject all bids within 60 days of bid opening, except that the bids of any bidders who consent thereto may, at the request of the Owner, be held for consideration for such longer period as may be agreed. The Owner will evaluate bids and any award will be made to the lowest, responsive, responsible bidder, in accordance with N.J.S.A. 40A:11-6.1. A copy of N.J.S.A. 40A:11-6.1 is included in Section entitled Local Public Contract of this specification. The Owner reserves the right to reject any or all bids and to waive minor informalities or irregularities in bids received. The qualification and reclassification of bidders will be subject to the statutory provisions contained in N.J.S.A. 40A:11-25 to 32 ("Local Public Contract Law"). A copy of N.J.S.A. 40A:11-25 to 32 is included in Section entitled "Local Public Contract Law" of this specification. Successful bidders, after notification of award, but prior to signing a construction contract, shall submit to the township and the Dept. of LWD, Construction EEO Monitoring Program an initial project workforce report (Form AA 201) electronically provided to the public agency by the Dept. LWD, Construction EEO Monitoring Program, through online for distribution to and completion by the contractor, in accordance with the N.J.A.C. 17:27-7. The contractor also agrees to submit a copy of the Monthly Project Workforce Report once a month thereafter for the duration of this contract to the Dept. of LWD, Construction EEO Monitoring Program and to the public agency compliance officer The successful bidder will also be required to submit bonds and proof of insurance on or before execution of their respective Contracts as explained in the Contract Documents. Bidders are required to comply with all relevant Federal and State Statues, Rules and Regulations including but not limited to the applicable provisions of Title VI of the Civil Rights Act of 1964 as amended (42 USC 2000d 2000D 4A), the discrimination and affirmative action provisions of NJSA 10:5-31 et seq. and NJAC 17:24 (Contract Compliance and Affirmative Action for Public Contracts), the rules and regulations promulgated pursuant thereto, the State requirement for bidders to supply statements of ownership (N.J.S.A. 52:25 24.2) and the State requirement for submission of the names and addresses of certain subcontractors (N.J.S.A. 40A:11 16). Challenges to bid specifications must be made, in writing, addressed to the Owner, at least, three (3) business days prior to the bid opening date. Challenges filed otherwise will not be considered. Pursuant to P.L. 2004, c.57 (N.J.S.A. 52:32-44) effective September 1, 2004, all business organizations that conduct business with a New Jersey government agency are required to be registered with the State of New Jersey. Any payment for contract documents must be made by business check and shall be made out to Mott Watkins Associates. If the Contract is awarded, no refunds will be given. If for any reason the Contract is not awarded, refunds will be made to bidders pursuant to N.J.S.A. 40A:11 24(b) when the Contract Documents are returned in reasonable condition within 90 days of notice that the Contract has not been awarded. It is the purpose of this Notice to Bidders to summarize some of the more important provisions of the Contract Documents. Prospective bidders are cautioned not to rely solely on this summary, but to read the Contract Documents in their entirety. The Township reserves the right to reject bids based upon the criteria specified in the Information to Bidders.

Award

Roads / Highways

$623,400.00

Public - City

Paving, Site Work

11

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Site Maintenance
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties, Mail Boxes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
79
Bidding Soon
1,540
All Active Projects
607
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2020

August 10, 2020

img_map_placeholder

Multiple Locations, Egg Harbor Township, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.