BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in San Francisco, California. Completed plans call for the construction of a 6,000-square-foot retail development; 6,000-square-foot day care center; five-story above grade, 101-unit multi-residential development; and 15-story above grade, 155-unit multi-residential development.

This is a Bid/Budget Update request for a Joint Venture project with Swinerton Rubecon. The Senior Building consists of 151 affordable senior apartments on 28,000 sf site bordered by Folsom, Beale, and future Clementina Street. The tower is a 9 story CIP structure with no basement. The following Scopes are being bid and bought-out at 50CD. Bids will be due 9/22/23: 1. Surveyor 2. Concrete 3. Structural Steel and Misc Metals 4. Below Grade Waterproofing 5. Doors, Frames, and Hardware 6. Metal Framing and Gypsum Board 7. Flooring 8. Appliances 9. Casework/Millwork 10. Countertops 11. Facility Chutes 12. Utilities We are looking to obtain Budget numbers for the following scopes to be bought out at 90%CD. Bids will be Due 11/22/23. 1. Final Clean 2. Scaffolding/ Barricades 3. Rough Carpentry 4. Finish Carpentry 5. Above Grade Waterproofing 6. Insulation / Fireproofing 7. Sheet Metal/ Flashing 8. Joint Sealants 9. Cement Plastering 10. Tiling 11. Acoustical Ceiling 12. Painting 13. Signage (in specialties) 14. Wall and Door Protection 15. Specialties (Bath Access's, fire extinguisher) 16. Postal Specialties 17. Closet Shelving 18. Pest Control Devices 19. Window Treatments 20. Bike Racks 21. Asphalt Paving 22. Concrete Paving 23. Unit Paving 24. Landscaping The remainder of the deliverable is for budget updates. Please make sure to reach out to your bid package specialist with any questions you may have. Scopes for bid scopes will be added to BC file tab in the attachments and agreements folder in the next 3 weeks. Bid logic to include: Labor pricing per the project schedule. Break out values for alternates and allowances. No material escalation should be included in base proposal. Applicable Bid Forms will be uploaded in the next couple of weeks. Your bid specialist will reach out to you direct and inform you of this. This project is administered in partnership with the Office of Community Investment and Infrastructure (OCII) and has a 50% SBE Goal, 50% Local Hiring Goal and requires the payment of prevailing wages. Please reference the attachments and subcontractor documents for more detailed information. Please pay specific attention to Section E of the SBE Policy, “Joint Ventures and Associations”. M/W/SBE are encouraged to apply. RFI's and constructability items are due 09/08/2023. Numbers are due 9/22/2023. Subsequent documents, such as attachments, agreements, drawing documents, reports, schedule, RFI batches and logistics will be posted prior to bid due date. Contact Peter Rafferty with any questions regarding scope of work: prafferty@swinerton.com 925-493-0644

Post-Bid

Multi-Residential

$100,000,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
171
Bidding Soon
3,220
All Active Projects
1,322
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 22, 2023

June 10, 2024

img_map_placeholder

200 Folsom St, San Francisco, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.