BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2020 at 8:00 PM

Updated September 15, 2023

Site work and renovation of a military facility in Old San Juan, Puerto Rico. Completed plans call civil work for a military facility.

- Work to be performed includes repair of Facility 1910 (Fuel Bulkhead). This repair work includes removal of existing hardware and extruded fenders in assigned areas, installation of new arch fenders in assigned areas, repair of concrete facing and deck slab, cleaning and recoating eight cleats and one mooring bollard, installation of approximately 264 feet of combi-wall, and construction of a concrete cap. 1. Removal of existing extruded fenders and associated hardware. 2. Repair of concrete facing along the Quay Wharf bulkhead. 3. Procure and installation of new elastomeric arch fenders along the Fuel and Quay Wharves. 4. Clean and recoat existing mooring cleats and bollards. 5. Construction of a new pipe-Z Combi-Wall bulkhead along the Fuel Wharf, complete with new concrete cap and backfill. 6. Construction of new temporary mono-piles with donut fenders for use by supply vessels during construction. The mono-piles and donut fenders shall be removed after the Fuel Wharf bulkhead is completed and turned over to the Government. 7. Remove and replace existing ladder and I-beams. 8. Related environmental controls during construction.

Post-Bid

Military

$15,000,000.00

Public - Federal

Renovation, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
2
Bidding Soon
28
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2020

August 31, 2020

Project location map

To Be Determined, Old San Juan, PR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.