BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Old San Juan, Puerto Rico. Contact the soliciting agency for additional information.

Award Details Contract Award Date: Sep 28, 2023 Contract Award Number: W912HN23D5000 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: QEMLRQA7PLG4 Contractor Awarded Name: AMENTUM SERVICES, INC. Contractor Awarded Address: Chantilly, VA 20151 USA Base and All Options Value (Total Contract Value): $5,000,000,000.00 The purpose of this acquisition is to establish a MATOC with a shared capacity of $5 billion, with a five-year ordering period, to accomplish power system stabilization and power generation services under North American Industry Classification System (NAICS) Code 221112- Fossil Fuel Electric Power Generation. The projects to be completed will be the responsibility of the USACE Savannah District. The primary contract focus is on temporary emergency power augmentation and on related repairs of generation facilities to stabilize the PR power system. The work will consist of providing land based temporary generating units (dual fuel - LNG/diesel), temporary transformers, control cabling, and installation of equipment. In addition, the work will contain operation of the equipment, including maintenance, fuel, coordination with Puerto Rico Electric and Power Authority (PREPA) and LUMA Energy (LUMA) on operation schedule and connections to their equipment. The Savannah District (SAS) intends to solicit and award a MATOC on an unrestricted basis and in accordance with the procedures at FAR 15.304(c)(1)(ii) in which award will be made to all qualifying offerors. A qualifying offeror is defined in FAR 2.101 as: "an offeror that is determined to be a responsible source, submits a technically acceptable proposal that conforms to the requirements of the solicitation, and the Contracting Officer has no reason to believe would be likely to offer other than fair and reasonable pricing." Price will be a selection factor for all orders placed under the awarded contracts. Under this MATOC, hybrid firm-fixed price (FFP) Task Orders with cost-plus fixed fee (CPFF) elements are anticipated due to the uncertainty and volatility surrounding the cost of the fuel required to power the generators. The CPFF line items will only be used for fuel. FAR 16.103(b) states a firm-fixed-price contract, which best utilizes the basic profit motive of business enterprise, shall be used when the risk involved is minimal or can be predicted with an acceptable degree of certainty. Due to the nature of well-defined performance-based objectives and standards which will be provided at the Task Order level for these services, the risk associated with this well defined work is low and therefore, USACE will utilize a firm-fixed price contract type for that portion of the work. However, the total cost for the Task Order-level power generation requirements is also heavily dependent on fuel costs, therefore fuel costs are the highest cost risk. The petroleum market has been volatile, with large swings in cost in recent history. As a result, the use of both FFP and CPFF elements at the Task Order level aids in the reduction of cost risks to the Government and is further mitigated in two ways. Procurements will be competed at the task order level among the MATOC pool under FAR 16.505 Fair Opportunity ordering procedures. An independent government estimate will be prepared for each task order requirement based upon the PWS for that task order. In addition to the expectation of adequate price competition at the task order level to support price analysis, offerors will be required to submit a detailed cost proposal for any included CPFF CLINs, which will be reviewed during the Fair Opportunity selection process. Cost risks will be mitigated by closely evaluating the cost proposal compared to the independent government estimate for these CLINs, performing cost analysis of proposed man-hours, materials, and subcontractors, and calculating the probable cost of performance or cost realism for these CLINs. This analysis will disclose whether offerors are proposing methods of performance that will unnecessarily increase the cost to the Government for these CLINs. This is information the Contracting Officer will consider in making a task order award decision under the FAR 16.505 Fair Opportunity procedures.

Award

Roads / Highways

$5,000,000,000.00

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
36
All Active Projects
19
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2023

September 7, 2023

img_map_placeholder

Multiple Locations, Old San Juan, PR

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.