BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a military facility in South Texarkana, Texas. Completed plans call for the renovation of a military facility.

This request for proposal is for a Design-Bid-Build (DBB) contract the complete Restoration and Modernization of Buildings B551 and B561 at Red River Army Depot (RRAD), Texarkana, TX. The Government intends to establish a Firm Fixed-Price (FFP) Contract for the repairs to buildings 551 and 561. The scope of work will include all work in accordance with the plans and specification to make necessary repairs to restore the failed and failing building components and correct regulatory code deficiencies. Renovation will increased wall height but will not replace the building walls. Existing walls shall be reinforced to accommodate for the renovations. Buildings 551 and 561, each provide 91k SF of depot level rebuild operation space capable of supporting multiple depot programs, including MaxxPRO, Military All-Terrain Vehicle (MATV), Family of Medium Tactical Vehicles (FMTV), Cougar, High Mobility Multipurpose Wheeled Vehicle (HMMWV), and Trailers for Army, Navy, Marines, and Field Maintenance Squadron (FMS). B551: 1. The following equipment items shall be removed and stored for reinstallation in the building: radiant heaters, HVLS fans, blue "turbo" fans, hose reels, and electrical cord reels. 2. The existing fire alarm system components shall be removed and stored for reinstallation in the building. 3. The existing air compressors (located on the west and south sides of the building) and associated equipment and canopy shall remain for reconnection to the building. 4. Portions of walls shall be selectively demolished for the installation of new roll-up doors. 5. Repair structural components in failing state and provide a standing seam metal roof. 6. Provide a code compliant electrical distribution system. 7. Provide a code compliant fire sprinkler system. 8. Provide a code-compliant fire alarm/mass notification system for each building, utilizing the reclaimed components to the greatest extent practical. 9. Provide exhaust fans, HVLS fans, and column/wall mounted fans in each building, utilizing the reclaimed fans to the greatest extent practical. 10. Provide a compressed air distribution system and accessories in each building. 11. Provide overhead lifting in each building. B561: 1. The following items shall be removed and stored for reinstallation in the RM building: radiant heaters, HVLS fans, blue "turbo" fans, yellow "cool zone" fans, and LED light fixtures. 2. The existing material handling equipment (3-ton floor-mounted bridge cranes and 1- and 3-ton floor mounted jib boom cranes) shall be removed and returned to the government for disposition. 3. The existing fire alarm system components shall be removed and stored for reinstallation in the building. 4. The existing air compressor (located on the south end of the building) and its associated equipment and canopy shall remain for reconnection to the building. 5. The following existing facilities shall remain for reconnection to the building: a. 14'x44' restrooms, 2 each, one at the northwest corner and one at the southwest corner b. 26'x42' break room on the east side c. 12'x40' office on the east side 6. Portions of walls shall be selectively demolished for the installation of new roll-up doors. 7. Repair structural components in failing state and provide a standing seam metal roof. The standing seam metal roof system will protect the integrity of the structural components in the existing structural system. 8. Provide a code compliant electrical distribution system. 9. Provide a code compliant fire sprinkler system. 10. Provide a code-compliant fire alarm/mass notification system for each building, utilizing the reclaimed components to the greatest extent practical. 11. Provide exhaust fans, HVLS fans, and column/wall mounted fans in each building, utilizing the reclaimed fans to the greatest extent practical. 13. Provide a compressed air distribution system and accessories in each building. 14. Provide overhead lifting in each building. Abatement of asbestos-containing materials shall be accomplished in both buildings, particularly in the renovated areas. B551 asbestos materials are roofing, caulking, foundation tar, fire doors, and the exterior wall coating (beneath paint). B561 asbestos materials are roofing, caulking, and fire doors. FAR 36.204(f) Disclosure of the magnitude of construction project between $25,000,000 and $100,000,000. The request for proposal is anticipated to be issued on or about 3 July 2020, and bids due on or about 3 August 2020. A firm-fixed price contract is anticipated to be awarded. Anticipated contract award date on or about 31 August 2020. Anticipated project completion date is 660 days from Notice to proceed. After solicitation issuance, contractors may view and/or download this solicitation and all amendments at the following internet address: https://www.beta.SAM.gov/. The use of the website requires prior registration at www.beta.SAM.gov/. Plans and specifications will not be made available in paper format or on compact disc. It is the Offerors responsibility to monitor the beta.SAM web site for amendments to the solicitation. You must be registered with the System Award for Management (SAM), to receive a Government contract award. You may register with SAM at https://www.sam.gov/. This contract is subject to the availability of funds per FAR clause 52.232-18. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. It is the offerors responsibility to view the beta.SAM website daily for amendments to the solicitation. Accordingly, prospective contractors may view and/or download the solicitation and all amendments from the beta.SAM address after solicitation issuance at the following address: httP-s://www.beta.SAM.gm!L. Solicitation Number: W9126G20B0031. Place of Performance: Red River Army Depot Texarkana, Texas 75501 United States All work required for the Renovation of B551 for the Shell Building at New Eave Height of 32', includes Restrooms, Plant Process Support (Comm. pipe & box, Elect., & Compressed Air), and Utility stub for breakroom. All work required for the Renovation of B561 for the Shell Building at New Eave Height of 32', includes Restrooms, Plant Process Support (Comm. pipe & box, Elect., & Compressed Air), and Utility stub for breakroom. MBE (19.7%), WBE (6.9%),

Bid Results

Military

$30,577,926.00

Public - Federal

Renovation

495

30

80

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
29
Bidding Soon
279
All Active Projects
124
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2020

January 14, 2021

img_map_placeholder

To Be Determined, South Texarkana, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.