BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Rockford, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; water / sewer project; and water / sewer project.

The Civil Engineer is not able to release bid tabulation information until after the owner has awarded. Proposals are now being accepted for the improvements of approximately 2,634 feet of roadway improvements along Alamo Drive, Leonard Road and New Milford School Road within the Village of New Milford. The improvements include HMA Surface Removal, Concrete Curb and Gutter Removal and Replacement, Paved Ditch Removal, HMA Surface Course, Concrete Gutter and Aggregate Wedge Shoulder. Each proposal must be accompanied by a certified check, cashiers check, or bid bond, payable to the Village of New Milford for the amount not less than five percent (5%) of the total amount of the proposal. All bidders shall note the following: (1) construction monies will be drawn from local funds on hand: (2) the successful contractor will be paid on a monthly basis according to the approved estimate of completed work: (3) the Village strongly urges all contractors to employ the use of local subcontractors, suppliers, and trades as much as possible for this contract. Labor rates shall be in accordance with the General Prevailing Rate of Wages for the Village of New Milford, Winnebago County, Illinois, and which are on file in the Office of the Department of Labor, Springfield, Illinois. Such rates shall be paid for all laborers, workman, or tradesman performing work under this contract. The Village reserves the right to reject any or all bids on each proposal, and to waive any information there in or to accept any proposal considered in the best interest of the Village. No bid shall be withdrawn after the opening of bids without written consent of the Village of New Milford for a period of forty-five (45) days after the scheduled time of closing of bids.

Award

Roads / Highways

$117,500.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
122
Bidding Soon
1,999
All Active Projects
843
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2020

August 10, 2020

img_map_placeholder

Multiple Locations, Rockford, IL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.