BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Paving for a road / highway in Orlando, Florida. Design plans call for paving for a road / highway.

Interstate 4 (I-4) Florida’s Regional Advanced Mobility Elements (FRAME) is a regional, intercity integrated corridor management (ICM) project running from the Central Business District in Tampa to the southwest side of Orlando at the Florida Turnpike. I-4 and the other ICM routes cross four (4) counties: Hillsborough, Polk, Osceola, and Orange. Please see Figure 1 for a map of the I-4 FRAME ICM routes. I-4 FRAME will cover 77 miles of I-4, 122 miles of other limited-access routes, and signalized arterial roadways with a total of 491 traffic signal systems. Construction Contract 1: 445362-2 I-4 Frame (D7): Design Completion- Fall 2021, Contractor Letting- Spring 2022, Approximate Construction Cost- $11.5M- see 1-4/SR 400 - ITS Communication System (Awarded) 447012-1 SR 60 CAV: Design Completion- Fall 2022, Contractor Letting- Spring 2022, Approximate Construction Cost- $1.7M Construction Contract 2: 445362-3 I-4 Frame (D1): Design Completion- Spring 2022, Contractor Letting- Summer 2022, Approximate Construction Cost- $9.3M- see 1-4/SR 400 - ITS Communication System (Letting Date: July 13, 2022) 445362-4 I-4 Frame (D5): Design Completion- Spring 2022, Contractor Letting- Summer 2022, Approximate Construction Cost- $3.7M 445362-5 I-4 Frame (FTE): Design Completion- Spring 2022, Contractor Letting- Summer 2022, Approximate Construction Cost- $1M As of January 4, 2022, Construction Contract 1 projects have completed design and are anticipated to let in Spring 2022. Construction is anticipated to begin in Summer 2022 and be completed in Summer 2024. Design for Construction Contract 2 projects is anticipated to be completed in Spring 2022. The projects will be let in Summer 2022. Construction on these projects is anticipated to begin in Fall 2022 and be completed in early 2025.

Design

Roads / Highways

$27,200,000.00

Public - County

Paving

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
62
Bidding Soon
1,292
All Active Projects
547
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2022

img_map_placeholder

I-4, Orlando, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.