BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a road / highway in Red Bluff, California. Completed plans call for site work for a road / highway.

Roadway Excavation, HMA (Type A), Culvert Work and RSP 02-Teh-5-36.3/41.6 In District 02 On Route 5 Project ID 0216000044 Federal-Aid Project ACHSIM-005-8(644)E In Tehama County Near Red Bluff From Nine Mile Hill Overcrossing To 0.1 Mile North Of Bowman Road Overcrossing The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12. 90 Working Days Submit your bid with bidders security equal to at least 10 percent of the bid. Bids must be on a unit price basis. Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates CADOT - Roadway Excavation, HMA (Type A), Culvert Work and RSP Do not bid less than 65 working days and not more than 90 working days. The estimated cost of the project is $4,860,000. The CRZ will be established by improving side slopes within the medians to a standard 4:1 or flatter, with the desired slope being 10:1. The project will utilize existing material within the median to construct embankments. Twenty-five culverts will be extended to accommodate the fill within the median, five of which will result in permanent impacts to the streambed. The culverts will be extended toward the median. The pipes will be joined with a new drainage inlet (DI) riser. There will be a new flowline down the center of the median that will feed this DI from above. The project also proposes to widen paved shoulders to 10 feet adjacent to the number one lane where the southbound climbing lane (PM 39.4/40.55) exists near the Cottonwood scales to meet mandatory standards. No other pavement work is proposed. Approximately 290 oaks will be removed within fill and excavation locations. 541 trees will remain in the median while meeting the goals of CRZ for the project. 0216000044

Award

Roads / Highways

$4,131,655.00

Public - State/Provincial

Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
7
Bidding Soon
117
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2021

October 18, 2021

img_map_placeholder

CA 005, Red Bluff, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.