BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, renovation and addition to an educational facility in Dallas, Texas. Completed plans call for the addition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

**As of September 3, 2020 this project has not yet been awarded. The project is expected to be awarded end of September 2020. ESTIMATED CONSTRUCTION BUDGET INCLUDING ALLOWANCES: Total for CSP# E225_P0017_3 $9,400,000.00 to $11,700,000.00 No further information will be publicly released until after the date the Agenda is publicized for the Board of Trustees briefing. The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive technicalities. The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors. The Dallas Independent School Districts Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal. Completed CSP Package Part 1-A, 1-B and 1-C are due on Tuesday, July 28, 2020 at 200 PM (local time) Completed CSP Package Part 2 is due on Wednesday, July 29, 2020 at 300 PM (local time) 1. Front Entry Addition and Renovation: A new secure front entry vestibule will be provided at the main entry. Existing offices will be renovated to provide new reception and administration spaces. Landscaping improvements and accessible route to the entry will be provided. 2. Kitchen Addition and Cafeteria Renovation: A new kitchen addition will be provided adjacent to the existing cafeteria. The kitchen addition will provide new two-line server and new food service equipment. The existing cafeteria will be renovated and the existing kitchen will be demolished to increase the area of the cafeteria. 3. Existing Building Renovations: Renovations throughout the existing building address lifecycle and educational adequacy improvements to the following areas: playground and vehicular traffic areas, interior finishes, classroom teaching surfaces, interior room and wayfinding signage, window and exterior sealant replacement, exterior painting, new exterior digital marquee, mechanical system replacement, fire alarm system replacement, and security and technology infrastructure. 4. Abatement of hazardous materials in the existing building.

Award

Educational

$8,502,005.00

Public - City

Addition, Renovation, Site Work

183

39

74

6

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
57
Bidding Soon
3,596
All Active Projects
1,424
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2020

September 28, 2020

img_map_placeholder

3815 S Franklin St, Dallas, TX

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.