BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2021 at 8:00 PM

Updated March 25, 2025

Site work for a bridge / tunnel in Canmore, Alberta. Conceptual plans call for site work for a bridge / tunnel.

Scope of work includes; Mobilization, pedestrian accommodation and demobilization Supply and install of temporary work platforms Removal, capture and disposal of existing timber coatings for two bridges Supply and install of new coating systems for two bridges Supply and install of re-finishing of two bridges Tender has been cancelled. If/when the project will be re-tendered is undetermined at this time.

Project Abandoned

Bridges / Tunnels

$250,000.00

Public - City

Site Work

11

10

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
6
Bidding Soon
75
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2021

November 24, 2021

Project location map

Multiple Locations, Canmore, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.