BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2025 at 8:00 PM

Updated April 17, 2025

Site work and new construction of an educational facility in Saskatoon, Saskatchewan. Design plans call for the construction of a 430,556-square-foot, 3,600-seat educational facility.

Plans call for a new educational complex within the Holmwood Suburban Centre to include two new schools and four athletic fields for 3,600 students from grade 9 to 12. An integrated 90-seat childcare facility will be included. Method of delivery is Design-Bid-Build (DBB). Site address to be confirmed. The neighborhood is east of McCormond Drive and currently undeveloped, with phasing plans anticipating full build out of the area complete by 2030. The site is anticipated to be shared with a community civic center; whether the civic center is a standalone building or integrated into the facility is yet to be determined. TIMELINE: Preliminary planning and design has commenced. Scope of work and schedules may be confirmed fall/late 2025. *Budget is unreleased.

Design

Educational

$55,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
15
Bidding Soon
199
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

To Be Determined, Saskatoon, SK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.