Published January 3, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a military facility in Annville, Pennsylvania. Completed plans call for the renovation of a military facility.

Provide all labor, material, devices, tools and equipment required for the renovation or the North side of building 19-101 Hangar (bathrooms, HVAC and LED lighting) at the Fort Indiantown Gap Pennsylvania National Guard Training Center, located in Annville, Lebanon County, PA and shall be in total accordance with the specifications and drawings and subject to the terms and conditions of all other Contract Documents. The work under this Contract shall generally consist of, but not necessarily be limited to, providing all labor, material, devices, tools and equipment required for the renovation or the North side of building 19-101 Hangar (bathrooms, HVAC and LED lighting) at the Fort Indiantown Gap Pennsylvania National Guard Training Center, located in Annville, Lebanon County, PA and shall be in total accordance with the specifications and drawings and subject to the terms and conditions of all other Contract Documents. Location: Area 19, Fort Indiantown Gap, Annville, PA ESTIMATED RANGE: 1 General - $1,000,001 - $1,500,000, 2 HVAC - $1,500,001 - $2,000,000, 3 Plumbing - $200,001 - $400,000, and 4 Electrical - $1,500,001 - $2,000,000 Liquidated Damages = (.1) $370.00 per day, (.2) $500.00 per day, (.3) $130.00 per day, (.4) $500.00 per day - Subject to change depending on which Base Bid the program office chooses. There is no Bid Guaranty required for this Project. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. This is a significant programmatic change from the SDB, and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - SDB = 10.0% VBE = 3.0% .2 HVAC - SDB = 7.0% VBE = 3.0% .4 Electrical - SDB = 12.0% VBE = 3.0% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Proposed Date of Completion 360 Calendar Days from the Initial Job Conference. Bid results: Electrical BB1-Shannon A Smith Inc-$509,660.00 BB2-Cedar Electric Inc - $666,416.00 General 12-98-East Coast Contracting Inc-$315,700.00 13-148-East Coast Contracting Inc-$354,700.00 HVAC BB1-W C Eshenaur and Son Inc-$645,865.00 BB2-W C Eshenaur and Son Inc-$1,138,314.00 Plumbing BB1-W C Eshenaur and Son Inc-$157,040.00 BB2-W C Eshenaur and Son Inc-$196,415.00

Bid Results

Military

$3,984,110.00

Public - State/Provincial

Renovation

18

7

2

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Membrane Roofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Bath Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Convectors
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
121
Bidding Soon
1,865
All Active Projects
857
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2022

February 14, 2023

img_map_placeholder

Area 19, Fort Indiantown Gap,, Annville, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

19-101 Hangar HVAC/LED Upgrades North Pennsylvania National Guard Training Center

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.