BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 2, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Fort Vermilion, Alberta. Completed plans call for site work for a bridge / tunnel.

Bridge Deck Concrete Overlay, Bridge Deck Joint Replacement and Other Work BF74227-Consol-P-2023-03-31 BF74227 88:18 BF 74227 - Carrying Hwy. 88 over Peace River, 8 km NW of Ft Vermilion kilometre 29.527 to 29.527 PEACE REGION APPROXIMATE QUANTITIES: 4495 Square Metres Surface Removal - Deck and Roof Slab 1 Lump Sum Demolition and Disposal of Bridge Structure 950 Metres Concrete Crack Repair - Curbs 2000 Anodes Galvanic Corrosion Protection - Supply and Install 113 Tonne Asphalt Concrete Pavement Mix Type H2 6000 Square Metres Erosion Control Soil Covering - Supply and Install (Type C) Contractor to supply all materials.

Bid Results

Bridges / Tunnels

$15,266,169.00

Public - State/Provincial

Site Work

39

7

15

2

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
6
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

April 10, 2024

Project location map

AB-88, Fort Vermilion, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.