Published September 8, 2020 at 8:00 PM
Updated October 1, 2024
Site work and paving for a road / highway in Cortland, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Milepost 208.17 to Milepost 212.76 The Work to be performed under the Contract for Project No. 39-20-03 (PART A), if any is awarded on the basis of the Bids, consists of removing and reconstructing the pavement in the right two (2) lanes and shoulder in both directions of the Ohio Turnpike. The Work includes, but is not limited to, excavating existing pavement, constructing full depth pavement, chemically stabilizing the subgrade, constructing approach and departure ramp pavement for new plaza in both directions, constructing a new access drive, performing slope repairs, performing drainage repairs and replacements, installing concrete barrier wall, asphalt curbs, guardrail, performing approach slab replacements, installing new box trusses and cantilever sign supports, pavement markings and other traffic control devices, performing temporary traffic control, tree removal, clearing and grubbing, right of way fence replacement, installing new ramp light foundations, light poles, pull boxes, installing a water well and septic system, and coordination with the 58-20-01 Building Contractor and the Toll Collection Systems Integrator Contractor. The Work to be performed under the Contract for Project No. 39-20-03 (PART B), if any is awarded on the basis of the Bids, consists of but not limited to, excavating and constructing embankment for grading preparation of the entire toll plaza site, performing drainage installations, guard rail installation, constructing full depth asphalt pavement, installation of pavement markings and other traffic control devices on both the north and south side of the Ohio Turnpike. All Work is to be performed as per the Plans, Drawings, Specifications, Special Provisions, Technical Specifications, and other Contract Documents for this Project Milepost 211.0 Bids are to be submitted in accordance with the Contract Documents prepared by the Commission. Prevailing Wage Rates and Equal Employment Opportunity requirements apply to this Project. The Small Business Enterprise (DBE/EDGE/SBE) Goal applicable to this Project is 11%. A Contract will be awarded, if any award be made, to the Bidder determined to have submitted the lowest responsive and responsible Bid for the performance of the Work. The Commission reserves the right to reject any and all Bids and to waive minor irregularities or technical deficiencies. OTIC Construction Contract No. 39-20-03 OTIC Design Contract No. 71-18-03 *This project timeline has been extended due to the public health crisis.
Award
Roads / Highways
$45,684,294.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 12 - Furnishings
Division 25 - Integrated Automation
Division 26 - Electrical
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2020
August 24, 2020
Multiple Locations, Cortland, OH
Related To This Project
Cortland, OH
Bid Date: Jul 16 2024
Cortland, OH
Bid Date: Aug 09 2024
Cortland, OH
Bid Date: Aug 15 2024
Cortland, OH
--
Cortland, OH
--
Cortland, OH
--
Cortland, OH
--
Cortland, OH
--
Cortland, OH
Bid Date: Jun 27 2024
Cortland, OH
Bid Date: May 30 2024
Cortland, OH
Bid Date: Apr 02 2025
Cortland, OH
Bid Date: May 17 2019
Cortland, OH
Bid Date: Feb 28 2024
Cortland, OH
Bid Date: Feb 29 2024
Cortland, OH
Bid Date: Feb 05 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Mainline Pavement Reconstruction and Toll Plaza 211 Site Construction - (Part A and Part B)
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.