Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Philadelphia, Pennsylvania. Completed plans call for site work for a water / sewer project.
Award Details Contract Award Date: Oct 20, 2020 Contract Award Number: N4008521C0005 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): Contractor Awarded Unique Entity ID (SAM): Contractor Awarded Name: WEEK MARINE, INC. Contractor Awarded Address: Covington, LA 70433 USA Base and All Options Value (Total Contract Value): $5958305.00 This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. The intent of this pre-solicitation synopsis is to notify potential offerors of an FY 20 Maintenance Dredging for Pier 4 (West Side) for the Government sites at the Philadelphia Navy Yard in the Public Works Department Pennsylvania area of responsibility. Maintenance dredging of approximately 150,000 cubic yards of sediment, using a sealed environmental clamshell bucket. Dredging for west side berthing area of Pier #4 is to support the safe mooring and decommissioning of various Naval vessels. Pier #4 is at the Naval Support Activity Mechanicsburg, Philadelphia Navy Yard Annex and is being used to decommission various US Naval vessels. For the river pilots to be able to safely maneuver vessels into their berths and to ensure that tidal cycles will not cause sediment accumulation around the hulls making final removal very difficult, the berths need to be dredged as follows; 1. 0 feet to 250 feet from the West side of Pier #4 dredge to a depth of -37' MLLW Minimum (-39' MLLW Maximum) 2. 2. 250 feet to 400 feet from the West of Pier #4 dredge to a depth of 28' minimum MLLW Minimum (-30' MLLW Maximum) One of the following two disposal sites are proposed to be utilized: A) Dredged materials shall be transported by bottom dumping barge or scow and disposed within the Weeks Marine Whites Rehandling Basin, located in Logan Township, Gloucester County, New Jersey. B) Dredged materials shall be placed in barges and hydraulically un-loaded at the Waste Management Corporation Biles Island disposal facility located in Morrisville, Bucks County, Pennsylvania. The project schedule will allow for dredging work to be performed 24 hours/7 days per week and will require a minimum daily production rate of 5,000 CY per day. The Contractor must furnish all labor, materials, equipment, tools, transportation, supervision, safety, surveys, layout work, quality control, traffic control, and management necessary to fulfill the requirements of task orders issued by the Contracting Officer under this contract. The Government contemplates that one Contract will be awarded for this solicitation. Each PWD Base location will administer the work that they order. Fy20 Maintenance Dredging for Pier 4 (West Side) for Government Sites at the Philadelphia Navy Yard in the Public Works Department Pennsylvania Area of Responsibility Competition Requirements: Full and Open Competition Procurement Method - Invitation for Bids Estimated Cost Range; $10,000,000.00 to $25,000,000.00
Award
Water / Sewer
$5,958,305.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2020
October 26, 2020
To Be Determined, Philadelphia, PA
Related To This Project
Philadelphia, PA
Bid Date: Mar 03 2022
Philadelphia, PA
Bid Date: Mar 29 2022
Philadelphia, PA
Bid Date: Mar 29 2022
Philadelphia, PA
Bid Date: Mar 25 2022
Philadelphia, PA
Bid Date: Mar 25 2022
Philadelphia, PA
Bid Date: Mar 25 2022
Philadelphia, PA
Bid Date: Mar 25 2022
Philadelphia, PA
--
Philadelphia, PA
Bid Date: Mar 30 2022
Philadelphia, PA
Bid Date: Aug 27 2021
Philadelphia, PA
Bid Date: Mar 08 2022
Philadelphia, PA
Bid Date: Mar 31 2022
Philadelphia, PA
--
Philadelphia, PA
Bid Date: Dec 09 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.