BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2020 at 8:00 PM

Updated January 26, 2024

Site work for a road / highway in Eugene, Oregon. Completed plans call for site work for a road / highway.

*This project timeline has been extended due to the public health crisis. This Project was originally Scheduled on bid 7/29/2020. Now Bid date changed from 7/30/2020. EWEB requires work to be performed for the removal of residential overhead electric services and the installation of underground service laterals and associated equipment to reestablish service. The work covered under this contract will be performed in two project locations: Saratoga/Donald Streets and Fair Oaks Drive (Oakway Vicinity) in Eugene, OR

Award

Roads / Highways

$520,000.00

Public - City

Site Work

4

1

2

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
27
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2020

September 4, 2020

Project location map

To Be Determined, Eugene, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.