Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Indianapolis, Indiana. Completed plans call for site work for a water / sewer project.
Sealed Bids for the TriCo Regional Sewer Utility - Lakewood Gardens, Williams Creek Farms, Woodhaven, and Timber Ridge Sanitary Sewer Extension project consisting of approximately 11,465 LF of HDPE DR11 IPS main line pressure sewer ranging in size from 2 to 3 inches in diameter, installed via horizontal directional drilling (HDD); together with all related work and appurtenances as specified and shown on the Drawings Bids from anyone not on the Issuing Office Plan Holders List will be returned unopened Bids shall be accompanied by a bid bond in an amount equal to five percent (5%) of the Bid to insure the execution of the contract for which the bid is made. In case the Bid is not accepted, the bid bond will be returned to the Bidder, but if the Bid is accepted and the Bidder shall refuse or neglect to enter into a contract with the Owner within ten (10) days after the time s/he has been notified of the acceptance of its Bid, the said bid bond shall be forfeited to the Owner as liquidated damages for the failure to do so. Approved performance and payment bonds guaranteeing faithful and proper performance on the work and materials, to be executed by an acceptable surety company, will be required of the Successful Bidder at the time s/he executes the contract. The bond will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the respective date of substantial completion. Also, upon Substantial Completion, a 3 year 10% Maintenance Bond of the overall contract shall be provided. A conditional or qualified Bid will not be accepted. Award will be made to the lowest responsive and responsible Bidder as determined in the sole discretion of the Owner. Proposals shall be properly and completely executed on proposal forms included in the Specifications. Proposals shall include all information requested by Indiana Form 96 (latest revision) included with the Specifications. Under Section III of Form 96, the Bidder shall submit a financial statement. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder, fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. No Bidder may withdraw his bid for a period of sixty (60) days after closing time scheduled for the receipt of bids. The Bidding Documents do provide for a liquidated damages clause to insure timely completion of the Project. The Owner reserves the right to accept any Bid, to reject any or all bids, to reject bids that do not meet the qualifications outlined in the Bidding Documents and/or to waive any formalities or irregularities in the bidding process or bids received where such acceptance, rejection or waiver is considered to be in the best interest of the Owner as determined by it in its sole discretion. The Owner further reserves the right to reject any Bid where evidence or information submitted by the Bidder does not satisfy the Owner that the Bidder is qualified to carry out the details of the Bidding Documents. The Owner further reserves the right to reject all bids should the Owner determine in its opinion, based on bids received, that the contemplated construction costs is not economically feasible. All requirements as indicated in the Bidding Documents shall be met by successful bidders. Lakewood Gardens Miller Pipeline:-$86900.00 Williams Creek Farms Miller Pipeline:-$58045.00 Woodhaven Miller Pipeline:-$91630.00 Timber Ridge Sanitary Sewer TPI Utility :-$73000.00
Award
Water / Sewer
$334,102.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to Project Search, and five free projects and companies. Subscribe for complete access to all contacts and documents to unlock opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
July 29, 2020
August 28, 2020
Multiple Locations, Indianapolis, IN
Related To This Project
Indianapolis, IN
Bid Date: Jun 06 2023
Indianapolis, IN
Bid Date: Jun 08 2023
Indianapolis, IN
Bid Date: Jun 22 2023
Indianapolis, IN
--
Indianapolis, IN
Bid Date: Jun 07 2023
Indianapolis, IN
Bid Date: Jun 07 2023
Indianapolis, IN
Bid Date: Jun 01 2023
Indianapolis, IN
Bid Date: Jun 08 2023
Indianapolis, IN
Bid Date: Jun 14 2023
Indianapolis, IN
Bid Date: Mar 07 2024
Indianapolis, IN
Bid Date: Jun 08 2023
Indianapolis, IN
Bid Date: May 16 2023
Indianapolis, IN
Bid Date: Oct 17 2023
Indianapolis, IN
Bid Date: May 26 2023
Indianapolis, IN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--