BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2023 at 7:00 PM

Updated January 29, 2024

Site work and paving for a mixed-use development in Dumfries, Virginia. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project will widen about two miles of Fraley Boulevard (Route 1, primarily in the Town of Dumfries) to three lanes in each direction between Bradys Hill Road and Route 234 (Dumfries Road). Currently in the Town of Dumfries, northbound Route 1 traffic is routed along the two-lane Fraley Boulevard and southbound Route 1 traffic is routed along Main Street. This project will add through lanes to Fraley Boulevard so it can be converted to three lanes of traffic in each direction with a raised median; as a result, Main Street will be converted to two-way local traffic via new pavement markings. The project will also: Construct a shared-use path for bicyclists and pedestrians along the southbound side of the new Fraley Boulevard alignment, and a sidewalk along the northbound side. Reconstruct and widen the Fraley Boulevard bridge over Quantico Creek. As of November 20, 2023, 60% of the design was completed by VDOT. Right of Way acquisition continues and is now in phase II. Final bridge design has been submitted to FEMA and VDOT for approval. Retaining wall design continues. Project is expected to advertise for construction in Fall/Winter 2024 with completion late 2026-early 2027. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Roads / Highways

$93,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
1
Bidding Soon
1,606
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2024

Project location map

US-1, Dumfries, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.