Renovation of a municipal facility in St Charles, Illinois. Completed plans call for the renovation of a municipal facility.

As of July 31 addendum 1 and 2 were issued. Please contact the owner for details. Project Information a.notice to Bidders: Qualified Bidders May Submit Bids for Project as Described in This Document. Submit Bids According to the Instructions to Bidders. 1.regulatory Requirements: Aia Document A701, "Instructions to Bidders" 2018 Edition Shall Govern Submittal, Opening, and Award of Bids. B.project Identification: Tri-com Central Dispatch Basement Seepage Remediation. 1.project Location: 3823 Karl Madsen Drive; St. Charles, Illinois 60175 Owner: Tri-com Central Dispatch 1.owner's Representative: Mr. Joe Schelstreet, Executive Director 3823 Karl Madsen Drive St. Charles, Illinois 60175 D.architect: Fgm Architects, Inc. 1.architect's Representative: Mr. Raymond Lee, Aia 1211 West 22nd Street, Suite 700 Oak Brook, Illinois 60523 Project Consists of a Replacing the Existing Interior Emergency Power Generator With New Exterior Emergency Power Generator, Interior Drain Tile Extensions, New Resilient Flooring, Foundation Water Proofing, and New Exterior Drain Tile and Pumping System. construction Contract: Bids Will Be Received for the Following Work: 1.general Contract (All Trades). Bid Submittal and Opening a.owner Will Receive Sealed Lump Sum Bids Until the Bid Time and Date at the Location Given. Bid Security a.bid Security Shall Be Submitted With Each Bid in the Amount of 10 Percent of the Bid Amount. No Bids May Be Withdrawn for a Period of 60 Days After Opening of Bids. Owner Reserves the Right to Reject Any and All Bids and to Waive Informalities and Irregularities. Time of Completion a.successful Bidder Shall Begin the Work on Receipt of the Notice to Proceed and Shall Complete the Work Within the Contract Time. Bidder's Qualifications a.bidders Must Be Properly Licensed Under the Laws Governing Their Respective Trades and Be Able to Obtain Insurance and Bonds Required for the Work. A Performance Bond, Separate Labor and Material Payment Bond, and Insurance in a Form Acceptable to Owner Will Be Required of the Successful Bidder. Bid Stipulations a.within Ten (10) Days After Notification of Award of Contract, the Successful Contractor Shall Furnish a Performance Bond, Separate Labor and Material Payment Bond, and Insurance in a Form Acceptable to Owner. The Performance Bond Shall Be in the Amount of 100 Percent of the Contract. The Performance Bond Will Become a Part of the Contract. B.the Failure of the Successful Bidder to Enter Into Contract and Supply the Required Bond and Certificates of Insurance Within Ten (10) Days After the Prescribed Forms Are Presented for Signature, or Within Such Extended Period as the Owner May Grant, Shall Constitute a Default. C.the Owner Reserves the Right to Accept or Reject Any or All Bids, to Waive Any Informalities and Irregularities in Any Bid, or to Make Awards in the Best Interests of the Owner. The Owner Also Reserves the Right to Award a Partial Amount of the Work Rather Than the Entire Amount. D.all Bids Submitted Shall Be Valid for a Period of at Least Sixty Days From Date of Bid Opening; the Only Alterations Which Will Be Allowed Will Be Those Approved by the Owner. E.all Contractors Submitting Bids Must Be in Compliance With the Prevailing Wage Act as Enacted by the State of Illinois. F.as Part of Their Bid, All Contractors Are Required to Sign, Notarize and Return the Contractor Certificates Included With This Bid Packet.

Post-Bid

Municipal

$75,000.00

Public - City

Renovation

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Quarry Tiling, Flooring, Resilient Flooring, Painting and Coating
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Transformers
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
119
Bidding Soon
2,428
All Active Projects
1,018
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2020

September 10, 2020

img_map_placeholder

3823 Karl Madsen Dr, St Charles, IL


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Tri-Com Central Dispatch Basement Seepage Remediation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.