Site work and paving for a road / highway in Palm Bay, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project consists of roadway Full Depth Reclamation (FDR) with cement and emulsion for Port Malabar Blvd from Palm Bay Road to Babcock Street in the City of Palm Bay. The roadway improvements include 2" milling the entire two travel lanes and then FDR remaining asphalt and then paving. Construction shall include all incidentals items for work to be performed as per the construction plans for the Port Malabar Blvd Road Improvements, and pay quantities provided in each of the bid documents. Accompanied by a certified or cashier's check (drawn in favor of the City of PalmBay, Florida) or by a Bid Bond in the amount of ten percent (10%) of the totalBid. The CONTRACTOR shall furnish certified copy of the recorded PerformanceBond and a certified copy of the recorded Labor and Materials Payment Bonds ("Bonds")meeting the approval of the CITY, each in an amount at least equal to the Contract Priceas security for the faithful performance and payment of all the CONTRACTOR's obligations under the Contract Documents Finally completed on the Final Completion Date and ready for final payment in accordance with this Agreement within two hundred ten (210) calendar days after the date when the Contract Time commences to run as provided in the Notice to Proceed Any Bidder's listing of exceptions in its bid will in no way obligate the CITY at any time to change the conditions of its bid or Agreement. Exceptions may be unacceptable to the CITY and may be cause for rejection of a Bidder's bid All questions about the meaning or intent of the Bid documents shall be submitted to City's Procurement Contact as listed in these Contract Documents in writing or via email. Questions received less than seven (7) calendar days prior to the due date for Bids will not be answered Question End Date 8/11/2020 5:00 PM o 8" Full Depth Reclamation (FDR) with cement and emulsion and paving along with striping (8,779 LF/1.66 miles). o Remove and replace one (1) drainage pipe and four (4) curb inlet boxes o Remove and replace 628 LF or 24" Miami curb and 40 LF of 6" raised curb

Award

Roads / Highways

$1,108,281.00

Public - City

Paving, Site Work

12

1

4

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
42
Bidding Soon
855
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2020

September 21, 2020

img_map_placeholder

Port Malabar Blvd NE, Palm Bay, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.