BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, new construction and addition to a pre-engineered storage facility in Cairo, Illinois. Completed plans call for the addition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and for the demolition of a pre-engineered storage facility.

Demolish and Construct Buildings and Additions Location - Cairo, Harrisburg, Murphysboro, and Pinckneyville Cairo - Demolish salt storage structure and construct new. Harrisburg - Construct new heated storage building. Murphysboro - Construct lean-to addition. Pinckneyville - Construct lean-to addition. Prequalification. Bidders and protected subcontractors must be prequalified with CDB; allow 45 days for application processing. For an application and a copy of CDB's Standard Documents for Construction (applicable to this project), phone 217/782-6152 (TDD 217/524-4449). MBE/WBE/PBE/VBE. MBE/WBE/PBE/VBE firms must be certified or registered with CMS as an MBE, WBE, PBE, or VBE prior to bidding. Prevailing Wage. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). Each contractor shall complete all work through Substantial Completion in accord with the contract within one hundred eighty (180) consecutive calendar days from the date of the Authorization to Proceed and shall complete all remaining work in accordance with the contract (Final Acceptance) within thirty (30) consecutive calendar days from the date of Substantial Completion.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$1,272,146.00

Public - State/Provincial

Addition, Demolition, New Construction, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
54
Bidding Soon
626
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2022

May 16, 2022

Project location map

Multiple Locations, Cairo, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.