BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Montour Falls, New York. Completed plans call for site work for a water / sewer project.

The Contract generally consists of water valve and fire hydrant replacement throughout the Village as well as altitude control valve replacement at the L'Hommedieu Water Tank site. The work includes all associated backfill and surface restoration required as a part of the work along with other work specified and indicated on the Construction Drawings. Each bid shall be accompanied by a certified check or bid bond in the amount of five percent (5%) of the maximum amount of the bid. The Contractor shall ensure that employees and applicants for employment are not discriminated against because of race, age, color, religion, sex, national origin or handicap status. The Supplementary Conditions set forth requirements for the payment by the Contractor and its Subcontractors of minimum wage rates for all classes of laborers and mechanics as set forth by the General Prevailing Minimum Wage Rates as determined by the New York Department of Labor, Article 8 Public Work, and Davis Bacon Act, as applicable to the Work. The Project is financed through the Community Development Block Grant Program. The Village of Montour Falls encourages Minority and Women Business Enterprises (MBE/WBE) and Section 3 enterprises to submit bids for this project. The selected contractor will be encouraged to ensure that to the greatest extent feasible opportunities for training and employment arising in connection with this NYS CDBG-assisted project will be extended to lower-income project area residents. Further, the contractor will be encouraged, to the greatest extent feasible, to utilize business concerns located in or substantially owned by residents of the project area, in the award of contracts and purchase of services and supplies. The Village of Montour Falls reserves the right to reject any and all bid proposals and to award the contract to the lowest responsible bidder for the total of all products of quantity and unit price Bid for each unit price item. No Bidder may withdraw his or her bid within sixty (60) days after the actual opening thereof.

Award

Water / Sewer

$800,000.00

Public - City

Site Work

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
66
Bidding Soon
984
All Active Projects
522
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2020

September 7, 2020

img_map_placeholder

Multiple Locations, Montour Falls, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.