BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Monterey, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.

In general, the work consists of, but is not limited to, the demolition and construction of concrete curb, gutter, cross gutter, sidewalk, curb ramps and driveways, storm drainage, signage and striping, isolated street surface repairs, pavement grinding, street reconstruction, adjustment of utilities, full depth reclamation, and Hot Mix Asphalt pavement. At the time of the bid opening, the successful Bidder must be legally entitled to perform contracts requiring a Class "A" General Engineering Contractor's license. Any Bidder or contractor not so licensed shall be subject to all penalties imposed by law including, but not limited to, any appropriate disciplinary action by the Contractors' State License Board. Local prevailing wage rates shall be paid in accordance with Sections 1770, 1773, and 1782, as amended, of the California Labor Code, and Section 28-20(f) of the Monterey City Code, on all public works construction contracts exceeding twenty-five thousand dollars ($25,000) and all public works contracts for alteration, demolition, repair or maintenance work exceeding fifteen thousand dollars ($15,000). Local wage rates may be obtained from City of Monterey, Engineering Division Office, City Hall, Monterey, CA, (831-646-3921) or the Director, Department of Industrial Relations, State of California, 455 Golden Gate Avenue, San Francisco, California (415-703-4774). Any Bidder contractor awarded a public works contract that uses a craft or classification not in the general prevailing wage determinations may be required to pay the wage rate most closely related in the general determinations, effective at the time of the call for bids. Cash, a certified check or cashier's check, payable to the order of the City of Monterey, or a satisfactory bid bond, in original form (no fax or photocopy shall be accepted), executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the bid amount shall be submitted with each bid. The bid bond must be notarized, include the embossed surety seal, and include a Power of Attorney if the signee is not an officer of the surety. No Bidder may withdraw their bid for a period of ninety (90) days from the date of opening of the bids for the purpose of reviewing the bids and investigating the qualifications of Bidders, prior to awarding of the contract. Any bid withdrawal before the expiration of such time period shall result in the forfeiture of Bidder's Bid Bond. In the event of a bid mistake resulting from a clerical error made by the Bidder, withdrawal of such bid without forfeiture of the Bid Bond may only be allowed if the criteria set forth in California Public Contracts Code Sec. 5103 are met and the procedures set forth therein are followed; any such approval by City of bidders request to withdraw bid shall be at the sole discretion of the City The City reserves the right to reject any or all bids as the best interests of the City may dictate and, to the extent permitted by law, waive any irregularity in any bid. If there is any reason for believing that collusion exists among the bidders, the City may reject any or all bids. Engineer's Estimated Cost: $1,200,000 to $1,350,000 Project Duration: 60 Work Days Liquidated Damages: $1,200.00 Per Calendar Day

Award

Roads / Highways

$1,258,847.00

Public - City

Paving, Site Work

41

7

10

9

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
73
Bidding Soon
1,320
All Active Projects
566
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 25, 2020

October 26, 2020

December 25, 2020

img_map_placeholder

Multiple Locations, Monterey, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.