BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Fresno, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of March 4, 2022, information regarding an award for this solicitation is not available. At this time, it is not known if an award has been made. Closed solicitation has been included below for reference. .................. The Blackstone McKinley BNSF Grade Separation project will eliminate two existing at-grade crossings by grade separating N. Blackstone Avenue and E. McKinley Avenue under the BNSF Mainline Track. The project will require Right of Way acquisitions, utility relocations, will be compatible and complementary to the "Better Blackstone" Initiative, and the South Blackstone Smart Mobility Strategy. The project will improve air quality and on-time service performance for the City's Bus Rapid Transit Service and remedy traffic for Fresno City College Parking Lot located at the northwest quadrant of the Blackstone and McKinley intersection Services will include preparation of necessary plans, specifications, estimates, and conducting necessary utility coordination for the project. The utility coordination includes, but is not limited to, submitting necessary applications, positive identification/pothole to confirm design conflicts, joint trench design, and resolving potential utility conflicts. The consultant should place an emphasis on value engineering design and consider alternative bridge construction (ABC) methods. In general:o Participate in coordination meetings with City staff, FCTA, Project Delivery Team, and Stakeholders as neededo Prepare and maintain a design delivery schedule to meet Project Completion Date of 2026o Coordinate all design matters with City Departments, BNSF, Amtrak, CPUC, FMFCD, and/or other agencies/stakeholderso Prepare utility notification letters and/or applicable documents to utilities and agencies as needed to begin utility relocations and/or Civil work o Conduct site investigation as needed to complete deliverables o Lead City Public Information meetings and prepare responses to public inquiries for City and FCTA to approve prior to publishing by the design team. Prepare exhibits and presentations as needed for Public Information Meetings in support of City and FCTAo Prepare Exhibits, presentations, and documentation as needed to support City Staff pursuing Project Funding Opportunitieso Right of way engineering including but not limited to preparing appraisal maps, deeds, legal descriptions, and exhibits as required by the City's Right of Way Team working on parcel acquisitions or temporary construction easementso Identify topographic survey requirements for City Survey team to perform survey and for the consultant to process City provided topographic survey informationo Prepare construction plans, technical specifications, and construction cost estimates at each phase of work identified in the consultant agreemento Develop and present an aesthetics plan to be incorporated into project elements as part of existing or future City Planning Initiatives o Identify and prepare early construction work packages for utility relocation, traffic handling/detours, and civil work to support an accelerated construction schedule/project completion while maintaining detour routes and bidirectional traffic on both Avenueso Submitting construction documents for review to City Departments, Independent Constructability Review/CM Consultant, utilities/agencies, and obtaining final signatures on construction documentso As part of the bidding phase, attend the pre-bid conference, prepare addenda and clarifications as needed, and attend bid openingo As part of the construction phases and general construction contract administration, attend the pre-construction meeting, kick off meeting, partnering sessions, review work shop drawings and other contractor submittals, provide clarification of construction documents during construction, review and provide technical information for construction contract change order request if necessary, perform site visits as needed during construction, and support City Construction Management Team as neededo Provide independent peer cost estimate, value engineering and constructability review. The City of Fresno reserves the right to reject any and all proposals For questions, contact Jesus Avitiavia email at jesus.avitia@fresno.gov

Conceptual

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
27
Bidding Soon
398
All Active Projects
171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2022

img_map_placeholder

E McKinley Ave & N Blackstone Ave, Fresno, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.