BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sacramento, California. Completed plans call for site work for a water / sewer project.

The work to be performed under this contract includes the furnishing of all labor, materials, tools, and equipment necessary for the 2020 Main Line Easement Rehabilitation Project. The work generally consists of the following: Pre cleaning and television inspection of 23,117 of main line. Installation of 19,996 linear feet of 6-inch cured-in-place pipe liner. Installation of 1,317 linear feet of 8-inch cured-in-place pipe liner. Installation of 1,804 linear feet of 10-inch cured-in-place pipe liner. Reinstatement of 621 lower lateral main line tap connections. Replacement of 135 SASD lower laterals and main line taps. Removal and Replacement of 22 flusher branches Any questions regarding the type of work to be done may be addressed to Lamont Bufford at (916) 875-0121 or buffordl@sacsewer.com. Responses will be provided to questions submitted up until August 06, 2020 at 11:00 AM. Each bid must be submitted on the bid forms provided in the Contract Documents. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Treasurer of Sacramento County, or cash for an amount no less than ten percent (10%) of the aggregate sum of the bid. The successful bidder shall be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the Sacramento Area Sewer District, each for not less than one hundred percent (100%) of the contract price. Pursuant to the California Contract Code Section 22300, the contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The Board reserves the right to reject any or all bids, to waive any formality in any bid, and to determine which bid, in the judgment of the Board, is the lowest responsive bid of a responsible bidder

Award

Water / Sewer

$1,468,242.00

Public - City

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
41
Bidding Soon
1,493
All Active Projects
653
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2020

October 19, 2020

img_map_placeholder

Multiple Locations, Sacramento, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.