Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Bourbonnais, Illinois. Completed plans call for site work for a water / sewer project.
Improvements to water system supplying Chippewa Campground; groundwater well located to the east of the campground include demolition of well house, installation of new groundwater well pump, well refurbishment and installation of a new pitless adapter, valve vault and control panel. Improvements at campground include installation of new yard hydrants and a prefabricated concrete water treatment building, associated process and yard piping and electrical improvements. Project site tour will follow the Pre-Bid Meeting at the project Well House on Highway 102 just west of County Highway 85. In accordance with the State of Illinois guidelines, participants will be asked to maintain social distance and should wear face coverings during the Pre-Bid Meeting. . Contractors have the option to attend the Pre-Bid Meeting virtually via WebEx. Note, the project site tour following the Pre-Bid Meeting will not be broadcast virtually. Bidders and protected subcontractors must be prequalified with CDB; allow 45 days for application processing. For an application and a copy of CDB's Standard Documents for Construction (applicable to this project), visit CDB's Website MBE/FBE/VBE firms must be certified or registered with CMS as an MBE, FBE, or VBE prior to bidding Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act(820 ILCS 130/1-12). Vendors must have an approved Illinois Procurement Gateway registration number and completed Form B, or submit the Standard Certifications and Disclosure Form(s) (Form A) with bid at time of submittal. Failure to provide a completed Form A standard certifications and financial disclosure or Form B, be registered with the Illinois Procurement Gateway, will result in rejection of bid. You are also required to submit disclosure forms and standard certifications for subcontractors not considered incidental to the performance of the contract with an annual value over $50,000 within 20 days of execution of your contract with CDB or execution of the contract between you and your subcontractor, whichever is later. A valid IPG registration number can be provided in lieu of hard copies of the standard certifications and financial disclosure forms. (See D. above.) Subcontractors must receive an Authorization to Proceed prior to performance of any work. Bidder may submit a written protest to the Protest Review Office following the requirements of the Administrative Rules, 44 Ill. Adm. Code 8.2075. For protests related to specifications, the Protest Review Office must physically receive the protest no later than fourteen (14) days after solicitation or related addendum was posted to the Bulletin. For protest related to rejection of individual bids or awards, the protest must be received by close of business no later than fourteen (14) days after the protesting party knows or should have known of the facts giving rise to the protest.
Award
Water / Sewer
$313,668.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2020
October 2, 2020
5314 IL-102, Bourbonnais, IL
Related To This Project
Bourbonnais, IL
Bid Date: Dec 04 2018
Bourbonnais, IL
Bid Date: Aug 16 2022
Bourbonnais, IL
Bid Date: Dec 19 2022
Bourbonnais, IL
Bid Date: Sep 23 2022
Bourbonnais, IL
Bid Date: Feb 08 2023
Bourbonnais, IL
Bid Date: Feb 13 2023
Bourbonnais, IL
Bid Date: Feb 21 2023
Bourbonnais, IL
Bid Date: Feb 20 2023
Bourbonnais, IL
Bid Date: Sep 17 2021
Bourbonnais, IL
Bid Date: Nov 22 2021
Bourbonnais, IL
Bid Date: Jun 27 2022
Bourbonnais, IL
Bid Date: Jun 10 2022
Bourbonnais, IL
Bid Date: Jun 24 2022
Bourbonnais, IL
--
Bourbonnais, IL
Bid Date: May 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.