BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and renovation of a mixed-use development in Toronto, Ontario. Design plans call for the demolition of a fitness / recreation center; for the construction of a 13,577-square-foot, four-story above grade fitness / recreation center; and for the renovation of a 4,320-square-foot, three-story above grade stadium.

Construction of a John Innes community recreation Centre replacement (targeted net zero energy/net zero emissions building) and façade upgrades, integrated into the existing Moss Park arena. The project also included will be tree planting and landscape improvement. The new John Innes Community Recreation Centre is targeted to be a Net Zero Energy Building (NZEB)/Net Zero Emissions Building. 12 short-term bicycle parking spaces are proposed at grade level. TIMELINE: Community Engagement began in 2023. As of January 2024, Site plan submission for a replacement arena has been made to the city of Toronto. Detailed design is complete. Working drawings will proceed spring/summer 2024 based on approvals. Tender is expected spring/summer 2025 pending approvals. Construction will proceed summer 2025 through fall 2027. *Timeline is subject to change and is separate from the Metrolinx Ontario Line subway line and station construction scheduled to happen during the same time frame.

Design

Fitness / Rec Centers

$27,457,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
122
Bidding Soon
2,498
All Active Projects
1,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

150 Sherbourne St, Toronto, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.