BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Port Orford, Oregon. Completed plans call for site work for a water / sewer project; and water / sewer project.

Bids received after this time will not be accepted. All interested parties are invited to attend. The project must be substantially complete 210 days after issuance of Notice to Proceed. Prequalification Required: Y Estimated construction cost for the Basic Bid is between $240,000 and $330,000. The project consists of the following major items of construction: 1. Basic Bid a. Chlorine Contact Tank Time Improvements include construction of a new 30,500-gallon horizontal stainless-steel tank including concrete spread footing, interior piping, baffles, vents, manway, and ladder. Work also includes water line installation, valves, connections, miscellaneous water line appurtenances, and site restoration. Bids will be received for a single prime Contract. Bids shall be on a lump sum basis as indicated in the Bid Form. No Bid will be considered unless fully completed in the manner provided in the Instructions to Bidders, and accompanied by a Bid Security executed in favor of the Owner in the amount of not less than 10% of the total amount of the Bid. Per ORS 279C.385 (2), Bid Security is to be forfeited as fixed and liquidated damages should the Bidder neglect or refuse to enter into a Contract and provide suitable insurance certificates, bonds, and other required documents for the faithful performance of the work in the event the Bidder is awarded the Contract. A Pre-Bid Conference will not be held. All Bidders must be "equal opportunity employers" and comply with the appropriate provisions of state and federal law. In addition, all Bidders are required to comply with ORS 656.017 regarding Workers' Compensation. Bidder, Contractor, and subcontractors are required to be registered with Construction Contractors Board. Pursuant to ORS 279C.505(2), all Bidders must certify with their Bids that they have an employee drug testing program in place. If awarded a Contract, Bidder must provide proof of such drug testing program when executed Agreements are returned to Owner. Bidders must prequalify with Owner as specified in the Instructions to Bidders, five (5) days prior to Bid opening. Each Bidder must submit a First-Tier Subcontractor Disclosure Form to the Owner within two working hours of the time for receipt of Bids in accordance with ORS 279C.370. Each Bidder must also submit Evidence of Authority to Sign Bid and Evidence to do Business in the State within two working hours of the time for receipt of the Bid. The Contractor and every subcontractor on the project shall pay at least the state prevailing rate of wage as determined under ORS 279C.815. ORS 279C.800 to 279C.870 will be administered and enforced in a manner that is consistent with state law and regulations adopted or guidelines issued in accordance with related acts. No Bid will be received or considered by the Owner unless the Bid contains: 1) a statement that Bidder will comply with the provisions of 40 USC 276a and ORS 279C.840 and 2) a statement as to whether the Bidder is a resident Bidder as defined in ORS 279A.120. The Owner reserves the right to reject any or all Bids, to waive all informalities, and to accept such Bids that in the opinion of the Owner are in the best interest of the Owner. No Bidder may withdraw or modify this Bid after the hour set for the receipt of Bids, and thereafter until the lapse of 70 days from the Bid opening.

Award

Water / Sewer

$240,115.00

Public - City

New Construction, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
5
Bidding Soon
84
All Active Projects
38
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2020

October 26, 2020

img_map_placeholder

1635 Arizona St, Port Orford, OR

Related To This Project


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.