Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 2, 2020 at 7:00 PM
Updated October 1, 2024
Renovation of a medical facility in Madison, Wisconsin. Completed plans call for the renovation of a medical facility.
In general the work consists of: the replacement of existing 5 kV ITE circuit breakers with new ABB replacement 5 kV retrofit circuit breakers including conversion of the 120V ac power for charging to dc power fed from the dc plant battery system. This project involves the the replacement of existing 5 kV ITE circuit breakers with new ABB 10 replacement 5 kV retrofit circuit breakers including conversion of the 120V ac power for 11 charging to dc power fed from the dc plant battery system. This includes supply, installation, 12 and commissioning of the replacement circuit breakers. ABB Roll-In-Replacement (RIR) AMVAC 5VHK 250 1200A circuit. A bid bond prepared on the Bid Bond Form bound herein, payable to the State in the amount not less than 10% of the maximum bid shall accompany each bid as a guarantee. A bank certified check or a cashier's check may accompany each bid as a guarantee pursuant to Wis. Stat. s. 779.14(1m)(c)2.b. and 779.14(1s). Failure to enter into the contract with the state (including failure to obtain certificate of insurance and separate 100% performance and 100% payment bonds) may result in forfeiture of the Bid Bond. The company issuing the Bonds must be licensed to do business in Wisconsin. The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is 18 advertising for bids from certified contractors for the above project. For questions on bid opening or bid tab posting, please contact: 43 DOADFDAdminServices@wisconsin.gov. All potential bidders must become certified by DOA prior to submitting bids on 21 state construction projects with budgets over $50,000. All bids received from contractors 22 who are not certified will be rejected. These changes take effect January 1, 2014. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Failure to visit the site or failure to examine any and all Contract Documents will in no way relieve the successful contractor from necessity of furnishing any materials or equipment, or performing any work, that may be required to complete the work in accordance with the Contract Documents. DFD reserves the right to reject the bid if evidence submitted by, or investigation of, the bidding firm fails to satisfy DFD that the firm is deemed responsible and qualified to carry out the obligations of the contract and fully complete all the work described in these bidding documents.
Under Construction
Medical
$220,930.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2020
October 30, 2020
301 Troy Dr, Madison, WI
Related To This Project
Madison, WI
Bid Date: Jul 22 2020
Madison, WI
--
Madison, WI
Bid Date: Jun 23 2020
Madison, WI
Bid Date: Jul 21 2020
Madison, WI
Bid Date: Jul 07 2020
Madison, WI
Bid Date: Jun 04 2020
Madison, WI
Bid Date: Jun 23 2020
Madison, WI
Bid Date: Jun 04 2020
Madison, WI
Bid Date: Oct 21 2020
Madison, WI
Bid Date: Dec 17 2020
Madison, WI
Bid Date: Oct 13 2020
Madison, WI
Bid Date: Feb 11 2021
Madison, WI
Bid Date: Jan 28 2021
Madison, WI
Bid Date: Jan 20 2021
Madison, WI
Bid Date: Apr 15 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.