BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Laramie, Wyoming. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

As of March 7, 2022, a general contractor was awarded and this project is in the under construction. *The closed solicitation has been included below for reference: Federal Project BUILD-I804271 Description: grading, draining, bituminous pavement surfacing, concrete pavement, bridge rehabilitation, electrical and miscellaneous work at various locations on I-80 for approximately 4.00 miles beginning at RM 221 between Laramie and Rawlins in Albany & Carbon Counties. County: Albany and Carbon Counties It is the responsibility of the Contractor to ensure that the bid envelope is received by Contracts and Estimates personnel, which can be verified by calling 307-777-4487. The Department of Transportation places the responsibility for delivery of the bids to the letting with the bidder. Bidders may elect to have their bids delivered by any delivery service or may hand carry their bids at the Casper Ramkota Hotel, 800 North Poplar Street in Casper, Wyoming 82601 Phone (307) 266-6000 For questions please contact the Contracts and Estimates office at (307) 777-4487. WYDOT Resident Engineer: Brad McCullough (Interim)Rock Springs (307)352-3036 Contractors desiring to look over the project before bidding are requested to make an appointment with theEngineer 24 hours in advance. Bidding Requirements:It is mandatory that all bids be prepared electronically using WY DOT Electronic Bid System (EBS) and a hardcopy of the bid be Submitted. An electronic bid bond is preferred, in the amount of 10 percent of the total bid.In lieu of the electronic bid bond, a cashier's check payable to the Transportation Commission of Wyoming in the amount of 10 percent of the bid is acceptable. Bids will be considered by the Transportation Commission of Wyoming, September 25, 2020. The Wyoming Department of Transportation reserves the right to reject any and all bids. WY DOT - Call Order 003: Laramie - Rawlins (I-80 Winter Freight Improvements)

Under Construction

Bridges / Tunnels

$19,861,281.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
14
Bidding Soon
277
All Active Projects
116
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.