Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 28, 2022 at 8:00 PM
Updated September 15, 2023
Site work and paving for a civil project in Milan, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
As of October 28 2022, the project is in the community outreach phase and A Planning an Environmental Linkages study is underway. Study completion is expected late 2023. A firm construction schedule has not been established. Phase I engineering services are required for the preparation of a Combined Design Report and an Environmental Impact Statement (EIS) for the structure that carries I-80 over the Mississippi River. District Two together with the Iowa Department of Transportation are currently developing a Planning and Environmental Linkages (PEL) study. Findings from this corridor study will be incorporated into this Phase I project. It is possible that the proposed improvements may include total replacement and widening of the structure and may be on new alignment. Various alternates will be studied to determine the most viable solution for this corridor. Impacts to the interchanges of I-80/IL 84 (IL side), which also crosses the Canadian Pacific (CP) Railroad, and I-80/US 67 (IA side) may need to be explored, along with other existing interchange locations as the project develops. Consideration should be given to the scenic overlook, as well as pedestrian and bicycle accommodations. Phase I tasks may include the preparation of Bridge Condition Report (BCR), Type Size Locations (TSL) drawings, SGRs/Geotechnical investigations, Value Engineering (VE) Study, Interchange Type Study (ITS), Intersection Design Studies (IDS), Traffic Management Analysis (TMA), Subsurface Utility Engineering (S.U.E.), remove/replace culverts, perform bathymetric survey, coordinating/conducting public involvement activities, including facilitating two virtual/public meetings, preparation of public meeting exhibits and graphic displays, preliminary cost estimates, cross sections, typical sections, a vessel collision study, traffic modeling and capacity analysis, preparation of ROW documents and related work. The completion date for this contract will be 36 months after authorization to proceed. The prime firm must be prequalified in the following category to be considered for this project: Location Design Studies (New Construction/Major Reconstruction) Structures (Major River Bridges) Statements of Interest, including resumes of the key personnel noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Prequalification Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 19 - RFQ Engineering - I-80 over the Mississippi River Corridor, Phase I Engineering Services and EIS
Design
Roads / Highways
$245,000,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2024
Interstate 80, Milan, IL
Related To This Project
Milan, IL
Bid Date: Jan 06 2023
Milan, IL
Bid Date: Mar 03 2023
Milan, IL
Bid Date: Jul 23 2021
Milan, IL
Bid Date: May 31 2023
Milan, IL
Bid Date: Jul 18 2023
Milan, IL
Bid Date: Sep 22 2023
Milan, IL
Bid Date: Jan 07 2022
Milan, IL
Bid Date: Nov 09 2022
Milan, IL
Bid Date: Nov 09 2022
Milan, IL
Bid Date: Nov 18 2022
Milan, IL
Bid Date: Sep 09 2022
Milan, IL
Bid Date: Dec 07 2022
Milan, IL
Bid Date: Nov 18 2022
Mount Sterling, IL
Bid Date: Nov 09 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed